SPECIFICATIONS
MODEL
WORKING WIDTH OF BRUSH DISK (in)
WORKING WIDTH OF SQUEEGEE (in)
SOLUTION TANK CAPACITY (gal)
RECOVERY TANK CAPACITY (gal)
BRUSH SPEED (rpm)
BRUSH PRESSURE (lbs)
VOLTAGE (V)
SUCTION MOTOR (W)
BRUSH MOTOR (W)
MAGNETIC VALVE POWER (W)
BATTERY CAPACITY (AH)
WEIGHT (lbs)
TRANSPORTATION PACKAGE SIZE (in.)
DP-SCRUB20
20
30
13
15
200
77
24
24V 550W
24V 750W
24V 12W
2x12V / 100
238
51x25x40
BEFORE FIRST USE
1. In order to avoid harmful interference, the machine
should be removed from the package carefully and
the accompanying documents and spare parts
should be checked with great care.
2. Only after having a full understanding towards the
content of operator’s manual, the operator can
handle this machine. (A specific person should be
assigned to operate this machine)
3. The sales engineer or distributor will introduce how
to control the handle bar.
4. Align the battery and make sure that the batteries
and output device are correctly connected. Never
make a mistake on the polarity of the battery. The
batteries can be connected with the power only
after the connection of batteries is confirmed to be
right. (This operation can be carried out only after
the on-spot inspection has been made by the sales
engineer.)
5. Connect the squeegee to its frame, then screw
down fixed handle and connect the tube to the
machine connection.
6. Take out the brush disk or needle bed and then
choose a proper brush disk or cleaning pad to
prepare for installation in accordance with the floor
condition.
7. With the lock open, the function test is carried on to
observe whether the power display and function keys
are normal. Only after further tests show nothing
wrong, the next operation can be implemented.
8. Pour water into the solution tank and then add proper
amount of cleaners; install the brush disk.
9. Loosen brake pedal.
10. Turn on power switch.
11. Lay down the squeegee and brush disk.
12. Start the suction motor and brush motor.
13. Pull the water valve switch upwards to regulate the
water output.
14. The clean-out operation can be carried out by push-
ing forward the control handle as well as adjusting
the walking rate.
15. After cleaning, the brush motor and water absorption
motor should be turned off one after another.
16. Uplift the brush disk, squeegee and drain the dirty
water out. The machine should be cleaned and main-
tained according to requirements on the operator’s
manual if a whole day’s work is finished.
17.
Move the machine to the parking place, turn off the
power and push down on the brake pedal.
New machines should be operated according to the following procedures during its first use.
(The operation should be implemented under the instruction of the sales engineer assigned by the company or agent)