CC7574DKV OPERATOR’S MANUAL
Parked Regen Screen 3
Parked Regen Screen 4
6. Use the UP/DOWN arrows to maneuver
through the screens until the “Request
Regen” soft key appears.
7. Select “Request Regen” to begin the
regeneration process.
NOTE: During the regeneration process, the
engine speed will increase and there may be
noticeable sound difference.
CAUTION
DO NOT attempt to operate the unit, change
engine RPM or move from “Parked/Stop”
while regeneration is occurring. This will
abort the regeneration process and require
to start the process over.
CAUTION
Once the process has started it can be
stopped by selecting the “Stop Regen” soft
key. DO NOT shutdown unless it is
absolutely necessary. Continue to monitor
the surrounding areas during the process. If
unsafe conditions develop, shutdown the
unit immediately.
The regeneration process will take
approximately 20-30 minutes to complete. The
following green pop-up message will appear on
the control screen when the process is
completed:
Parked Regen Complete Screen
When this message appears, the machine can
return to normal operation.
62
Summary of Contents for CC7574DKV
Page 1: ...CORE CUT OPERATOR S MANUAL CC7574DKV CC7574DKV 3 MAY 2022 Part 1802742 01...
Page 2: ......
Page 11: ...CC7574DKV OPERATOR S MANUAL CC7574DKV Specifications 11...
Page 12: ...CC7574DKV OPERATOR S MANUAL CC7574DKV 3 Specifications 12...
Page 65: ...CC7574DKV OPERATOR S MANUAL Appendix B CC7574DKV RPM Chart CC7574DKV 3 RPM Charts 65...
Page 66: ...CC7574DKV OPERATOR S MANUAL 66...
Page 67: ...CC7574DKV OPERATOR S MANUAL CC7574DKV Blade Size Conversion Chart 67...
Page 68: ...CC7574DKV OPERATOR S MANUAL CC7574DKV 3 Blade Size Conversion Chart 68...
Page 71: ......