background image

DIAPER-DEPOT

®

HORIZONTAL CHANGING STATION

Installation Instructions (IMPORTANT: Keep for future reference – Read Carefully)

What you will need:

• Measuring Tape
• Stud Finder
• Screwdriver
• 5.56mm Drill Bit(regular&masonry)
• 3.18mm Drill Bit(regular&masonry)
• 12.7mm Drill Bit(regular&masonry)
• Drill
• Pencil

Determine which mounting hardware will
be used: 
Set A – Wood Screws for mounting into
wood studs
Set B –Toggle Bolts for mounting into
metal studs or sheetrock/tile wall (a 
clearance or 8.9cm is required behind the 
wall for the toggle to expand).

Open

Closed

Manufacturer strongly recommends
installation as shown. When installed at
63,5cm A.F.F., as depicted, along an 
accessible route, the Diaper-Depot meets
the following requirements of the ADA 
accessibility guidelines, when applicable:

4.4.1 Protruding objects (closed unit)
4.2.5 Forward reach
4.2.6 Side reach
4.23.3 and 4.23.7 fixtures
4.27.4 Hand operation
4.32.3 Knee clearances at counter
4.32.4 Height of counters

For technical assistance please contact Schrama Handels GmbH 

• phone: +43 (0) 5285 63067 • website: www.hygiene-shop.eu

1 Depot (side view)

1 Mounting Template

6 Wood Screws

6 Machine Bolts

6 Toggles

1 Decal

6 Fender Washers

6 Finished Washers

Side View

Changing Arm

51.12cm

69.22cm

76.84cm

63.50cm

63.50cm

10.16cm

103.5cm

80.43cm

103.5cm

80.43cm

Floor (not drawn to scale)

1. Using the diagram above as a guide, mark the four mounting points on the 
wall. Using 40.64cm stud walls, mark the top two holes 103.50cm above the floor
and the lower two holes 80.43cm above the floor. Measure the exact distance 
between the holes you are using from the back of the depot,and transfer these
measurements onto the corresponding wall lines.

2. A. For Wood Studs: Drill through the ceramic tile or surface finish at the 
marked hole locations with a 5.56mm masonry bit until you hit the stud, then
change to a 3.18mm regular bit to complete the hole through the stud.

B. For Metal Studs Or Underlying Surface of Concrete Block: Drill at the marked
hole locations with a 12.7mm masonry drill bit. You 
must allow a minimum 8.9cm of inside wall space
for toggles to turn. Insert and tighten all four toggles.

A. Insert toggle in 
hole drilled

B. Pull ring and push 
cap lightly against wall

C. Snap off strap

D. Install unit using
screws and washer
supplied

3. Place a finishing washer first and then a fender washer over each screw.

A. For Wood Studs - Lift the depot in the open
position and align the wood screws into the upper
pre-drilled holes. Tighten each screw until the unit
is held firmly in place. Repeat installation of the
lower screws and tighten all screws until the unit
is held securely.

B. For Metal Studs Or Underlying Surface Of
Concrete Block - Lift the depot in the open
position and align mounting holes with pre-drilled
holes. Insert machine screws with washers into
pre-drilled holes. Tighten each bolt until the unit
is held securely in place.

4.Fill liner dispenser with liners. For replacement liners please
call +43 (0) 5285 63067.

Remove backing from decal and secure it to the outside

of the restroom door or other highly visible location.

Reviews: