18
PM-000084-D - Slasher Operators Manual - OCTOBER 2017
8 MAINTENANCE - OIL CHANGE
IMPORTANT: OIL CHANGE SCHEDULE
SLASHERS WITH GEARBOX
SLASHERS WITH DIRECT DRIVE
FIRST OIL CHANGE
Within the first 30 hours of use
Within the first year
2ND OIL CHANGE PLUS SUBSEQUENT OIL CHANGES
After 300 hours of use thereafter
Every 3 years thereafter
SLASHER MODEL
OIL TYPE
OIL QTY (ml)
1250MM MULTIFIT (SL-000227)
CASTROL ALPHASYN EP 320
(SYNTHETIC)
OR EQUIVALENT
650 ml
1250MM SLIDE SHIFT FRAME (SL-000225)
1500MM MULTIFIT (SL-000002)
CASTROL ISO SP 320
(MINERAL)
OR EQUIVALENT
250 ml
1500MM SIDE SHIFT SLIDE FRAME (SL-000103)
1500MM EXCAVATOR MOUNT (SL-000153)
1500MM SIDE SHIFT SLIDE FRAME C/W EXCAVATOR MOUNT (SL-000165)
1500MM SIDE SHIFT FRAME (SL-000267)
1800MM MULTIFIT (SL-000170 / SL-000255)
1800MM SIDE SHIFT SLIDE FRAME (SL-000228)
1800MM MULTIFIT HEAVY DUTY PICK UP (SL-000283)
This symbol only refers to slashers which use a planetary drive gearbox.
This symbol only refers to slashers which are direct drive units
.
THE GEARBOX OIL CAPACITY IS ENGRAVED ONTO THE SERIAL TAG LOCATED ON THE SIDE OF THE SLASHER.
Initial (Bed-in) oil change:
The first oil change must be carried out within the first 30 hours of operation. Thereafter, every 300 hours.
The first oil change must be carried out within the first year of operation. Thereafter, every 3 years.
With all slashers, to inspect and change the oil is recommended to be done by a Digga Authorised Service Agent.
Howerever if that is not possible, please refer to the Digga document PM-000151.