4.Installing Tx1500
1
Prepare the Turnstile assembly
th
tep:
S
The floor where the turnstile will be fixed must meet the following specifications:
a.
1,6mm x l
1,4mm x
Dimensions: Direction of flow
columns width
concrete
height
10 cm;
b.
;
Necessary height: 2. meters
5
c.
;
Level the floor for better product performance
d.
;
Floor specification (FCK15 M.P.A. concrete or equivalent)
e.
1,6m x 1,4m x 2,6m.
Floor specification (FCK15 M.P.A. concrete or equivalent)
Power point input and network cable can be on the floor, preferably at point 3 or
overhead pipes.
Obs.:
The dimensions of the concrete block and power inputs are only a suggestion.
The client can choose smaller bases (footing) at the fixing points (determined by
template).
List of tools for assembling the Turnstile:
INFORMATION:
Illustrative image (measures specified in “mm”).
Duct
Point 4
Reference point
Point 1
Point 3
Point 2
725
628
628
362
725
Torniquete
Tx1500
07
1 socket wrench with
socket of 14 and
17mm;
1 combination wrench
17;
1 socket wrench 10
with extension;
1
;
n.3 Allen wrench
1 n. 5 Allen wrench;
1 medium-sized
Philips screwdriver;
1 medium-sized
screwdriver;
1 hard plastic
hammer
1 plum-line or water
level;
1 silicone tube;
Molykote BR2 Plus
graphite grease;
Step ladder with four
steps;
Electric drill and drill
bits for concrete with
6 and 14 cm;
Bolter – 10 parts for
every product.