Single-Ended I/O Modules
UltraSCSI RAID Enclosure 5–17
Table 5–8 Installing Two Enclosure System Cables (Continued)
4. On the first (master) I/O module, align the Cable A connector with
the left connector.
CXO5854A
Cable A
Gently insert the cable connector into module connector. Tighten
both cable connector thumb screws to fully seat the connector.
Install a wire tie through the holes on the cable support bracket and
around the cable. Tighten the wire tie.
5. Align the module with the Port 1 backplane connector in the master
enclosure shroud. Gently insert the module and fully seat it. Use a
screwdriver to tighten the spring-loaded mounting screws.
6. On an expansion I/O module, align the Cable A with the left
connector. Gently insert the cable connector into module connector.
Tighten both cable connector thumb screws to fully seat the
connector.
CXO5840A
6
4
2
5
3
1
6
4
2
5
3
1
Cable A
Install a wire tie through the holes on the cable support bracket and
around the cable. Tighten the wire tie.
Summary of Contents for StorageWorks UltraSCSI DS-BA370 Series
Page 18: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 54: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 84: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 120: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 186: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...