Power Distribution
UltraSCSI RAID Enclosure 6–13
Table 6–3 Installing a Shelf Power Supply
1. Remove the supply from the electrostatic shipping container and
verify that it is a 180 W power supply by checking the bezel label.
2. Lay the supply on a flat surface.
CXO-4314A-MC
3. Insert the shelf power supply into the guide slots and push it in to
fully seat it and the bezel mounting tabs engage the shelf.
4. Connect the power cord to the shelf power supply.
5. Both status LEDs should be O
N
.
Power Controller Error Condition Reporting
There are no power controller status indicators. A possible indication of a
power controller failure is that both status LEDs on all the associated shelf
power supplies are O
FF
. This could also indicate an ac power failure.
Summary of Contents for StorageWorks UltraSCSI DS-BA370 Series
Page 18: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 54: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 84: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 120: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...
Page 186: ...SES Template Word 7 Blank Page Fix by Peter LaQuerre...