Operating Instructions
20
DigiTrak
®
F5
®
SST
®
Operator’s Manual
SST Job Site Setup
6. Stage SST Equipment and Power Source Adjacent to Tooling Assembly
In preparation for powering up the F5 SST equipment, position the following items adjacent to the tooling
assembly, along with the required cords, cables, and supplies for connecting the components:
F5 SST receiver and fully charged battery pack
SST transmitter
SST remote display (if using a panel-mounted MFD, remove it from the drill rig console; contact
your dealer for assistance if necessary)
Multi-function cable box (MFCB)
Power source, such as a generator or 12
–28V battery
Amp meter
NOTE
: Keep the remote display with its magnetic mounting bracket at least 5 ft (1.5 m) from
the SST transmitter or damage to the SST transmitter could occur.
At least 30 ft (9 m)
from tool to drill
About 10 ft (3 m)
from transit
to drill
MINIMUM
30 ft (9 m)
NO METAL ZONE
Surveyed
bore path
marked with
string line
Non-mag tooling
assembly with
bit oriented at 0°
Transit
Centerline of boom
Centerpoint of drive chuck
Drill