Inspecting the Equipment
If any equipment received has been damaged during shipment, keep the shipping cartons and packing
materials for the carrier or place of purchase and file a claim for shipping damage. If you discover
damage after acceptance, file a claim for concealed damage.
Unpacking the Cabinet
CAUTION
Unpacking the cabinet in a low-temperature environment may cause condensation to
occur in and on the cabinet. Do not install the cabinet until the inside and outside of the
cabinet are absolutely dry (hazard of electric shock).
The cabinet is heavy. Be careful to unpack and move the cabinet.
Carefully move and open the carton. Keep the components packaged until ready to install.
To unpack the cabinet and accessories:
1.
Open the outer carton and remove the accessories packaged with the cabinet.
2.
Carefully lift the cabinet out of the outer carton.
3.
Discard or recycle the packaging in a responsible manner, or store it for future use.
Place the cabinet in a protected area that has adequate airflow and is free of humidity,
flammable gas, and corrosion.
Checking the accessories
It includes:
UPS quick installation guide
Software Suite CD
USB cable
Power cord (Input and output)
Rackmount Installation
The Rackmount cabinet comes with all of the hardwarerequired for installation in a standard EIA or JIS
seismic Rackmountconfiguration with square and round mounting holes. The rail assemblies adjust to
mount in 19” racks with a distance from front to rear around 70~76 cm (27 to 30 inches) deep.