To install the rail kit:
1.
Assemble the left and right rails to the rear rails as shown in FIG.2.Do not tighten the screws.
Adjust each rail size for the depth of your rack.
FIG. 2 Securing the Rails
2.
Select the proper size in the rack for positioning the UPS (see FIG.3). The rail occupies four positions on the
front and rear of the rack.
3.
Tighten four M5 rivet nuts in the side of rail assembly(see FIG.2).
4.
Fix one rail assembly to the front of the rack with one M5×12 pan-head screw and one M5 cage nut.Using
two M5 cage nuts and two M5×12 pan-head screws, to fix the rail assembly to the rear of the rack.
FIG. 3 Fixing the Rails