1.3.LED Function
This section explains the definition of the Switch’s LEDs on the front panel.
8-Port 100 2 Gigabit combo Layer 2 Management Switch with 8 PSE port
embedded 100W PoE power budget
:
PWR
(
Green
) LED lights up, it shows the system is powered up.
Link/Act
(
Green
) LED lights up, it indicates a successful connection of that
port is established. Otherwise, it indicates the link is off or
no-link detected of that port. When the LED blinks, it
indicates the port is activating and transmitting data;
PoE
(
Amber
) LED lights up only when the corresponding port supply power.
1.4.Reset Button
There is a Reset button on the front panel, which has two functionalities:
a)
To restore switch configuration to factory defaults
Press the
Reset
button for more than 10 seconds, switch configuration will
be restored to factory defaults and then reboots.
b)
To reboot switch
Press the
Reset
button for less than 10 seconds, switch will reboot.
Please note, you will lose unsaved change when doing this.
1.5.Installing the Switch
This section describes how to install and make connection to your Managed
Switch. The following diagram shows the a typical network configuration,
Figure shows the network configuration for L2/L2+ Management Switch with
PoE function.
Figure 2.5.2
Network Configuration for L2 Management Switch with PoE
Layer 2/2+ Management Switch Series
7