P750LV2.1 industrial gate motor manual
12
9. Manual release
A: What to do during a power failure:
The gate can be manually pushed open and close if there is no power. To do this, you need to release
the release bolt.
(1)
Open the front door and turn the switch (circuit breaker) OFF (even though there is no power)
(2)
Fit spanner (provided) onto the manual release bolt nicely.
(3)
Turn the spanner
anti-clockwise
1 turn. Take the spanner off the manual release bolts. The
gate can now be manually opened and closed. DO NOT TURN THEBOLT MORE THAN
ONE TURN, OTHERWISE OIL COME OUT
(4)
After the gate was pushed to the required position, fit the spanner onto the manual release
blots, clockwise turn and make the bolts tight, otherwise maybe cause oil leaking.
B: What to do if power is reconnected:
(1)
Make sure the switch (circuit breaker) is still OFF.
(2)
Fit the spanner onto the bolt nicely and clockwise turn the manual release blots and make sure
the bolt is tight
(3)
Turn on the switch on, the gate should start to close if no signal input on PEB (safety) and
OPN (open) inputs
(4)
When gate hit on receiving post, the controller will recall the all the settings and ready to
operate.
MANUAL RELEASE