21
halves together and turn the two halves over. Remove the top half of the tray and pick up the
remaining primers that are now shiny side up.
•
Pivot the Primer Alarm Lever away from the Early Warning System Housing and invert the Pickup
Tube over the Primer Shield Cap. Pull the Retaining Clip and allow the primers to drop into the
Magazine—verify no primers remain in the Pickup Tube.
•
Pivot the Switch Lever back over the hole and gently slide the Follower Rod down through the
Switch Lever and into the Primer Magazine Tube. The Black Plastic Follower Rod will activate the
Primer Early Warning Alarm when there are approximately three to four primers left.
Primer
Alarm Lever
pivoted back
Primer Alarm
switch activated
by Rod and Lever
Invert Pickup Tube
over Primer Shield
Cap opening—remove
Retaining Clip allowing
primers to drop into
Magazine Tube
Slide
Follower Rod
Through
Lever into
Magazine
Tube
Summary of Contents for Square Deal B
Page 50: ...50 13 DILLON PRECISION Square Deal B EXPLODED VIEWS AND PARTS IDENTIFIER 13 1 Main Assembly ...
Page 51: ...51 13 2 Frame and Lower Assembly Index Assembly Index Assembly installed in Frame Index Pawl ...
Page 52: ...52 13 3 Typical Toolhead Assembly 45ACP Shown ...
Page 53: ...53 13 4 Automatic Primer Assembly ...
Page 55: ...55 13 6 Primer Early Warning System ...