33
Retrieve the alternate Primer Slide Assembly. Disconnect the Primer Slide return Spring by rotating the
Primer Slide Assembly clockwise to disengage it from the Primer Slide Body
Install the replacement Primer Slide Assembly by rotating it into place as shown below. Re-attach the
return spring and remount the Primer Assembly to the Square Deal with the 3 Screws previously removed.
Gently cycle the Operating Handle to the priming position—full push stroke to the rear, to make sure there
is no binding of the Priming Cup in the Shellplate and the Shellplate indexes properly.
Re-connect the
Return Spring
Install the replacement Primer
Slide Assembly by rotating it into
position as shown
Re-attach the Primer Assembly with the 3
Mounting Screws—Note— the top screw is
longer than the bottom two
Disconnect the
Return Spring
Remove the Primer Slide
Assembly by rotating it
clockwise
Summary of Contents for Square Deal B
Page 50: ...50 13 DILLON PRECISION Square Deal B EXPLODED VIEWS AND PARTS IDENTIFIER 13 1 Main Assembly ...
Page 51: ...51 13 2 Frame and Lower Assembly Index Assembly Index Assembly installed in Frame Index Pawl ...
Page 52: ...52 13 3 Typical Toolhead Assembly 45ACP Shown ...
Page 53: ...53 13 4 Automatic Primer Assembly ...
Page 55: ...55 13 6 Primer Early Warning System ...