49
•
Clean and lightly grease each one of the 4 Brass Bearings (18077).
•
Reinstall the Mainshaft in the Frame and reinstall the four Link Arms Brass Bearings, the two Link Arms in the
correct orientation (Dillon to the outside and right side up), Washers and re-tighten the Retaining Screws
12.3.
General Cleanliness
•
The reloading process is inherently "dirty" because of residue from used primers, leftover corn cobb
from
tumbling and spilled powder. The reloading process of sizing, seating bullets and primers can generate
metal particles. Carefully blow the system out frequently and remove any debris.
Clean and apply
grease to inside and
outside surfaces of
all 4 Brass Link Arm
Bearings
Summary of Contents for Square Deal B
Page 50: ...50 13 DILLON PRECISION Square Deal B EXPLODED VIEWS AND PARTS IDENTIFIER 13 1 Main Assembly ...
Page 51: ...51 13 2 Frame and Lower Assembly Index Assembly Index Assembly installed in Frame Index Pawl ...
Page 52: ...52 13 3 Typical Toolhead Assembly 45ACP Shown ...
Page 53: ...53 13 4 Automatic Primer Assembly ...
Page 55: ...55 13 6 Primer Early Warning System ...