❖Wiring

Red

R(200V 50/60Hz)

PC-A

Power cable

White

S(200V 50/60Hz)

0.75mm

2

Black

T(200V 50/60Hz)
Not wiring when single phase

Green/Yellow

E(Earth)

1

PC-B

Signal cable

2

0.5mm

2

Option

3
4

5
6

Wire #

1:2

1A at AC 250V or less

7

3:4

1A at DC 30V  or less

5:6

8

24V GND

Example for circuit

7           8

Wire # 7:8  9:10  11:12

S5:S6

  0V   EMG

100V

5V

24V

CPU

7,9,11 ,S5

5V GND

8,10,12, S6

9

Feed input

Wire #

1A at AC 250V or less

10

24V GND

S1:S2

1A at DC 30V or less

11

Release input

S3:S4

12

24V GND

S1
S2
S3

PC-C

S4

0.5mm

2

S5

S6

Blown:24V GND

White:Emergency stop

To Emergency stop circuit

Emergency and press
processing select

Need to short the circuit of press processing select(S5, S6), if you don't use the
circuit.

DANGER

To cover each cable which is not using connection.

Green:Emergency stop

To Emergency stop circuit

Black:Emergency stop
Red:Emergency stop

Need to wire the release signal, Otherwise Not available in continuous feeding
because of checking the movement of the press using two cam signals.

CAUTION

Yellow:Press cont.
processing

Need to short, if not
using.

You can select which 3 phase or single phase. If it's single phase, you don't have to connect the black wire.

Press cam signal

DANGER

Connect to the primary side

Drive stop signal output

To the stop continuous
on the press circuit

Work shortage sensor
output

Input stop
of Feeder

Press cam signal

CAUTION

To the stop continuous
on the press circuit

Continuous stop signal
output

To the stop continuous
on the press circuit

Need to short, if not
using.

3

Summary of Contents for R30

Page 1: ... Power switch Release Mode is not displayed in Set state Exclusive type Feed Angle R30 R40 R50 Exclusive type P6 8M 8M 2 M6 12 4 M14 30 8 5 6M With air filter Numeric value that can be changed item or number will be blink First push on Sync Release switch keep it When Sync Release is turned off the display returns the main screen Press rotation speed DIMAC Net 4ml 4 M8 25 1 M12 120 1 3 8B 2 2 8B N...

Page 2: ...C Mounting position Main machine Mounting position 5 5 4 3 2 1 5 4 3 2 1 Using No 1 Using No 5 85 117 5 4 3 2 1 5 4 3 2 1 Confirmation of balance Assembly drawing of the bracket 210 265 190 245 260 315 220 275 240 295 h 0 h 30 h 60 h 90 h 120 h 150 130 185 170 225 150 205 140 195 110 165 120 175 100 155 90 145 70 125 Bolster h mm 95 CAUTION The plate center equals the feeding rolls center Bolster ...

Page 3: ...ing select S5 S6 if you don t use the circuit DANGER To cover each cable which is not using connection Green Emergency stop To Emergency stop circuit Black Emergency stop Red Emergency stop Need to wire the release signal Otherwise Not available in continuous feeding because of checking the movement of the press using two cam signals CAUTION Yellow Press cont processing Need to short if not using ...

Page 4: ...d inside the connecting cover Connecting cover Air piping 3 8B To Air connector 2 8B Approximate air pressure 0 3 0 5 MPa Maximum air pressure 0 5 MPa CAUTION 2 8B DANGER Need to fix three external cables in prepared nylon band Air passes in specific direction 4 ...

Page 5: ...lease off state Release angles setting It can be input from 1 to 50 Input the release start using the press cam signal Release timer setting It can be input from 0 001sec to 0 05 sec Input time period the release carry out Input the release start using the press cam signal The delay time will vary depending in the springs pressure Set the ON to the release start angle and set the OFF to the finish...

Page 6: ...ction Checking the voltage C 50 1 C 50 2 Number State Content Note Motor connection anomaly Contact failure I F 7 7 7 7 7 7 666666 101010 Input stop signal during driving press 1 0 1 0 1 0 662662 663663 777777 1 1 1 1 1 1 Another work shortage sensor ON Work shortage sensor release Another work shortage sensor release Turn on Sync Feed and Sync Release after turn on Reset switch 664664 661661 Afte...