ACTUATOR FIXING
Choose measures referring to the table you can find in the
previous page, mark them on the pillars and continue as
follows:
• Fix brackets on the pillars and on the gate making use of
wedges. If structure and materials make it possible, you can
weld the brackets directly.
• Close the swing.
• Unlock the actuators.
• Position the actuators on the brackets.
• Insert the 2 pins in the special housing.
• Insert and screw the 2 grub screws with a 6mm allen
spanner.
• Open and close the swings repeatedly manually to verify the
absence of frictions between gate and ground.
m
WARNING: in order to avoid damage to the actuator,
please adhere to the following conditions:
• The brackets must be installed at the same height.
• The maximum stroke of arm A (in case of gate completely
closed) should not exceed 370mm for MOOV-B300, 470 mm
for MOOV-B400 and 670 mm for MOOV-B600.
• The minimum stroke of arm B must be more than 70 mm (in
case of gate completely open).
m
WARNING: the brackets MUST be placed as shown by
the picture. Setting wrongly one single bracket can seriously
damage the motor.
Summary of Contents for MOOV-B300 120V
Page 1: ......
Page 2: ......
Page 4: ......
Page 35: ......
Page 36: ......
Page 38: ......
Page 46: ...ITALIANO 8 TABELLA COLLEGAMENTI ELETTRICI...
Page 58: ...ENGLISH 20 ELECTRICAL CONNECTION TABLE...
Page 70: ...FRAN AIS 32 TABLEAU BRANCHEMENTS LECTRIQUES...
Page 82: ...ESPA OL 44 CUADRO DE CONEXIONES EL CTRICAS...
Page 94: ...PORTUGU S 56 TABELA CONEX ES EL CTRICAS...
Page 106: ...DEUTSCH 68 TABELLE ELEKTRISCHE ANSCHL SSE...
Page 118: ...NEDERLANDS 80 ELEKTRISCHE AANSLUITINGEN...
Page 123: ......
Page 124: ......
Page 126: ...L1 P1...
Page 148: ......
Page 150: ...Fig 1 Fig 2 Fig 3...
Page 151: ...Fig 4 SYNCHRO...
Page 152: ...Fig 5 NO SYNCHRO...