INSTALLATION  INSTRUCTIONS

PREPARATION

The heater will arrive separately 
from its storage bricks, the following 
bricks will be required.

FXL12i - 8 bricks
FXL18i - 12 bricks
FXL24i - 16 bricks

Two supplies are required for the 
operation of this heater - a restricted Off 
Peak or Economy 7 supply for the storage 
circuit, and an unrestricted supply for the 
fan boost element circuit.
Thermostatic fan / boost control is 
provided on the heater, however the fan 
/ boost operation may be customised by 
the introduction of an external timer to 
the heater (see section 3).

WARNING - This appliance 

must be earthed

Only heat resisting cable (min. rating T85) 
should be used.  The wires in the mains 
cable will be coloured as follows:-

GREEN & YELLOW - EARTH

BLUE - NEUTRAL

BROWN - LIVE

SUGGESTED FIXINGS

SOLID BRICK/BLOCK - 

No. 10 Size plastic 

inserts, 8mm drill bit.  Drill hole 15mm 

deeper than plastic insert length.

PLASTERBOARD - 

If possible locate 

studding and use No. 10 woodscrews 

directly into the wood, otherwise M5 rawlplug 

intersets are suitable.

NOTE: FOR OTHER WALL TYPES - 

(e.g. 

timberframe and hollow concrete) 

SEEK 

SPECIALIST ADVICE.

INSTALLATION

1. 

ENSURE THAT FIXING KIT HAS BEEN 

LOCATED BEFORE DISPOSING OF 
PACKAGING.

Remove the front panel by removing the 

three screws along its bottom edge. With 

hands positioned on each side of the panel, 

lift upwards to unhook the top edge whilst 

pressing down on the top panel with your 

thumbs.  The panel can now be lifted clear 

and set to one side.

Remove the packing pieces from the slots 

on the inner front (2 on the FXL12i, 3 on the 

FXL18i and 4 on the FXL24i).

2. 

Remove the inner front panel by 

unscrewing the screws along its top and 

sides.  As the front insulation is attached 

care must be taken when lifting this panel 

from the heater and placing it to one side.

Remove the three inner guards by removing 

the screws along their bottom edges and 

sliding the guards up and off the base tray. 

Please note the location of each guard.

3. 

CONNECTION OF THE MAINS CABLE 

- Connect the restricted (E7) supply to the 

terminal block, marked “Storage Circuit”, 

having first passed the cable through a 

front cable clamp in the base. Connect the 

unrestricted (Peak) supply to the terminal 

block, marked “Fan/Boost Circuit”, having 

passed this cable through another cable 

clamp in the base.

At this point, if desired, an external fan/

boost timer may be 

fi

 tted to the heater by 

passing the two wires from the timer through 

the remaining cable clamp, and connecting 

them across the terminal block, marked 

“Timer”, having already removed the link 

fi

 tted across this block at the factory. 

IMPORTANT: When using an external 

fan/boost timer, the fan inhibitor must 

be disabled (see Section 4).

Connect the EARTH lead from both supplies 

to the terminal marked with the symbol

IMPORTANT

 

DURING

 

NORMAL

 

OPERATION

 

ENSURE

 

BOTH

 

SUPPLIES

 

ARE

 

SWITCHED

 

ON

 

AT

 

THE

 

WALL

.

STORAGE CIRCUIT

FAN/BOOST 
CIRCUIT

24i

18i

12i

Summary of Contents for FXL12i

Page 1: ...Y GUARDED Contact your installer or the manufacturer for further advice This appliance is not intended for use by persons including children with reduced physical sensory or mental capabilities or lack of experience and knowledge unless they have been given supervision for instruction concerning use of the appliance by a person responsible for their safety Children should be supervised to ensure t...

Page 2: ...e top edge whilst pressing down on the top panel with your thumbs The panel can now be lifted clear and set to one side Remove the packing pieces from the slots on the inner front 2 on the FXL12i 3 on the FXL18i and 4 on the FXL24i 2 Remove the inner front panel by unscrewing the screws along its top and sides As the front insulation is attached care must be taken when lifting this panel from the ...

Page 3: ...ent to allow access for the back rows of bricks On the FXL24i remove the element to the right of centre on the FXL18i remove the central element and on the FXL12i the left hand element should be removed Loosen the two screws securing the element tails in the ceramic connector block and lift the element up and out of the heater 11 Carefully fit the bottom row of the back layer of bricks placing the...

Page 4: ...oost being activated until the core is partially depleted When the core is almost fully depleted the direct acting element will automatically switch to full power full boost Dependent on the option the installer has chosen see installation instructions point 4 the fan and boost will operate as follows Option 1 two stage fan recommended for domestic installations If boost option is not selected Nor...

Reviews: