SOL202TIP – SOL808TIP - Tile integrated roof kit manual
Page 38 of 52
R02893-1 10/13
SOLAR
Step: 50
11
11
11
P41
P41
P41
Step: 49
11
11
11
Align upper
perforation
with collectors
edge!
P41
P41
P41
Bend the connection strip
along the perforations on
the lower side.
Place the connection
strips so that the upper
perforation on the lower
side is aligned with the
collectors edge.