Operation & Maintenance
Connections should be double checked prior to commissioning of the system. Please
refer to the On Site Guide for guidance on how to commission and operate the solar
system.
Risk of scalding! Before carrying out any maintenance work on the system ensure that
it is safe to do so. The solar system must be decommissioned before work can be car-
ried out. Refer to the On Site Guide for a maintenance schedule of the complete system.
Check for leaks at the collector connections and other connections in the system. Also
ensure pipe insulation is intact and in good condition.
Step: 71
Finally form the
aluminium apron to
the contours of the
roof tiles as shown in
Step 71 and fix it
with the adhesive
strip.
Take care that the
roof tiles are clean!