OPERATOR’S MANUAL
with Maintenance Information
Maintenance
44
A-10
Perform 30 Day Service
The 30 day maintenance procedure is a one
time procedure to be performed after the first
30 days or 40 hours of usage. After this
interval, refer to the maintenance tables for
continued scheduled maintenance.
1
Perform the following maintenance
procedures:
•·B-6 Inspect the Tires and Wheels
(including lug nut torque)
•·B-15 Perform Engine Maintenance
A-11
Perform Engine Maintenance
Engine specifications require that this one-time
procedure be performed after 50 hours of
operation.
Required maintenance procedures and
additional engine information is available in the
engine operator’s manual.
A-12
Perform Drive Axle Maintenance
Axle specifications require that this procedure
be performed every 100 hours.
Required maintenance procedures and
additional Axle information is available in the
Axle operator’s manual.
Summary of Contents for JCPT2223RTA
Page 2: ...OPERATOR S MANUAL with Maintenance Information Version of the Record 1 ...
Page 3: ......
Page 5: ......
Page 7: ......
Page 19: ...OPERATOR S MANUAL with Maintenance Information Decals 12 ...