Test the Drive Speed - Stowed
Position
Dingli requires that this procedure be
performed every 250 hours or quarterly,
whichever comes
Proper drive function movement is essential to
safe machine operation. The drive function
should respond quickly and smoothly to
operator control. Drive performance should
also be free of hesitation, jerking and unusual
noise over the entire proportionally control led
speed range.
1
Create start and finish lines by marking
two lines on the ground 12.2m apart.
2
Turn the key switch to platform controls
3
Pull out the platform red Emergency Stop
button to the on position.
4
Turn the red Emergency Stop button
clockwise to the on position.
5
Start the engine from the platform controls.
6
Lower the platform to the stowed position.
7
Choose a point on the machine; i.e.,
contact patch of a tire, as a visual
reference for use when crossing the start
and finish lines.
8
Bring the machine to maximum drive
speed before reaching the start line. Begin
timing when your reference point on the
machine crosses the start line.
9
Continue at full speed and note the time
when the machine reference point passes
over the finish line. The time is less than
6.6 sec.
B-11
Test the Drive Speed -Raised Position
Dingli requires that this procedure be
performed every 250 hours or quarterly,
whichever comes first.
Proper drive function movement is essential to
safe machine operation. The drive function
should respond quickly and smoothly to
operator control. Drive performance should
also be free of hesitation, jerking and unusual
noise over the entire proportionally control led
speed range.
1
Create start and finish lines by marking
two lines on the ground 12.2m apart.
2
Turn the key switch to platform controls
3
Pull out the platform red Emergency Stop
button to the on position.
4
Turn the red Emergency Stop button
clockwise to the on position.
5
Start the engine from the platform controls.
6
Press and hold the function enable button.
Raise the platform approximately 4.0m
from the ground.
7
Choose a point on the machine; i.e.,
contact patch of a tire, as a visual
reference for use when crossing the start
and finish lines.
8
Bring the machine to maximum drive
speed before reaching the start line. Begin
timing when your reference point on the
machine crosses the start line.
9
Continue at full speed and note the time
when the machine reference point passes
over the finish line. The time is less than
88 sec.
Summary of Contents for JCPT2223RTA
Page 2: ...OPERATOR S MANUAL with Maintenance Information Version of the Record 1 ...
Page 3: ......
Page 5: ......
Page 7: ......
Page 19: ...OPERATOR S MANUAL with Maintenance Information Decals 12 ...