9
⑽
open spray gun insurance .
⑾
paint gun mouth to discard the paint wall inside the bucket ,deduction under the
trigger,and the spray gun to paint the original old solvent removed ,until the clean
up of the new solvent exclusion .
(
as the above chart
)
⑿
close spray gun insurance
(
as the right chart
)
⒀
slowly pressure control buttons will be set in the high pressure
(
green areas
)
position.
⒁
carefully check the equipment in every area whether there is a drip phenomenon
and if so ,please follow the
“
pressure relief steps
”
for pressure relief ,then drip
screwed tightly onto the site .
2. spraying
:
⑴
add suction pipe will be required for spraying paint bucket .
⑵
add to the waste will be returned in paint buckets.
⑶
pressure control button will be set in the middle (yellow area)but the bottom of the
location of equipment functioning .
⑷
return valve will be installed in the vertical position .
⑸
start equipment
⑹
equipment to begin operation until the outflow of the paint from the reflux tube .
⑺
shut \close equipment power .
⑻
move the reflux tube to the coating buckets
⑼
return valve will be set in the horizontal position.
⑽
Turn on the power switch.
⑾
open spray gun insurance .
⑿
the deduction under the trigger devices from the residual solvent until at gunpoint
from the emit of paint
(
as the right chart
)
⒀
close spray gun insurance .
(
as the right chart
)
⒁
shut the power switch .
⒂
fitted jackets and nozzle and nozzle screwed tightly .
⒃
turn on the power switch .
⒄
slowly pressure control buttons will be set to middle or high pressure (the yellow
or green area ),in the first trial elsewhere spray ,paint and gradually increase the
pressure until the coating completely fogging up ,you can begin construction .