DINO 240RXT
12
Do not use ladders, steps or other similar equipment on the platform.
Never throw any objects from the platform.
The lift must not be used for transferring goods or persons between different floors or working levels.
Never disable the operation of any safety device.
Always make sure before lowering the platform that the area on the underside is clear of any
obstructions.
Avoid damaging the platform by lowering it on the ground or bringing it in contact with any structures.
When working in busy areas the operating range of the lift must be clearly marked either by using
warning lights or fencing.
Also observe the regulations of the Road Traffic Act.
Beware of the live aerial power lines in the area - observe the minimum safety distances:
Keep the lift clean of any dirt which may impair the safe operation and impede the inspection of the
structures
The device must be serviced and inspected regularly.
Only skilled persons who are familiar with the service and reparation instructions are allowed to carry
out the service and reparation work.
It is strictly prohibited to use a lift which is out of order.
The operator must be given instructions and consent from the manufacturer for all
such specific work methods or conditions, which the manufacturer has not explicitly
defined
The device must neither be altered without the manufacturer’s consent nor be used
under conditions which do not meet the requirements set by the manufacturer.
Voltage
Min. distance below
(m)
Min. distance at the
side (m)
100 – 400 V hanging spiral
cable
0,5 0,5
100 – 400 V open-wire cable
2
2
6 – 45 kV
2
3
110 kV
3
5
220 kV
4
5
400 kV
5
5
Summary of Contents for 240RXT
Page 2: ...DINO 240RXT 2...
Page 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Page 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Page 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Page 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Page 36: ...DINO 240RXT 36 Notes...
Page 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Page 41: ...DINO 240RXT 41 1...
Page 58: ...DINO 240RXT 58 Notes...
Page 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Page 61: ...DINO 240RXT 61...
Page 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Page 84: ...DINO 240RXT 84...
Page 85: ...DINO 240RXT 85...
Page 86: ...DINO 240RXT 86...
Page 87: ...DINO 240RXT 87...
Page 88: ...DINO 240RXT 88...
Page 89: ...DINO 240RXT 89...
Page 90: ...DINO 240RXT 90...
Page 91: ...DINO 240RXT 91...
Page 92: ...DINO 240RXT 92...
Page 93: ...DINO 240RXT 93...
Page 94: ...DINO 240RXT 94...
Page 95: ...DINO 240RXT 95...
Page 96: ...DINO 240RXT 96...
Page 97: ...DINO 240RXT 97...
Page 98: ...DINO 240RXT 98...
Page 99: ...DINO 240RXT 99...
Page 100: ...DINO 240RXT 100...
Page 101: ...DINO 240RXT 101...
Page 102: ...DINO 240RXT 102...
Page 103: ...DINO 240RXT 103...
Page 104: ...DINO 240RXT 104...
Page 105: ...DINO 240RXT 105...
Page 106: ...DINO 240RXT 106...
Page 107: ...DINO 240RXT 107 Notes...
Page 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Page 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Page 113: ...DINO 240RXT 113 Notes...