DINO 240RXT
38
17.2 SERVICE AND INSPECTION INSTRUCTIONS
1. The first service after 20 hours of operation
-
change the pressure and return filter elements
2. Daily service
-
check the oil level in the hydraulics and the engine, top up if necessary
-
check the hydraulic connections
-
check the unit visually
-
check the operation of the emergency descent and emergency stop functions
-
check the operation of the safety devices
3. Weekly service
-
check the tyre pressure (300 kPa)
-
lubricate the joint pins (refer to the lubrication plan)
-
check the sliding surfaces of the telescope and apply silicon if necessary
-
check the clearance between the slide pads and surfaces and adjust the pads if necessary
-
put a load of about 215 kg onto the platform and drive the boom to level position
Continue by extending the telescope until the red signal light lights up and the movement stops.
Measure the stroke in accordance with the instructions and compare it with the setting of the
outreach limit RK4. If the stroke exceeds the allowed value, contact the service person (see point
"Testing the outreach limit switch").
4. Service measures every six months
-
change the hydraulic oil and both filters
-
check the condition of the brakes
-
grease the gear ring of the turning device bearing
5. Periodic service every 12 months ín accordance with the instructions for regular servicing
below in this manual
IF THE LIFT IS OPERATED UNDER DEMANDING CONDITIONS (IN EXCEPTIONALLY
HUMID OR DUSTY ENVIRONMENT, CORROSIVE CLIMATE, ETC.), THE INTERVALS
BETWEEN THE OIL CHANGES AND THE OTHER INSPECTIONS SHALL BE
SHORTENED TO MEET THE PREVAILING CONDITIONS IN ORDER TO MAINTAIN THE
OPERATIONAL SAFETY AND RELIABILITY OF THE LIFT.
THE PERFORMANCE OF THE PERIODIC SERVICING AND THE INSPECTIONS IS
ABSOLUTELY MANDATORY, BECAUSE THEIR NEGLIGENCE MAY IMPAIR THE
OPERATIONAL SAFETY OF THE LIFT.
THE GUARANTEE WILL NOT REMAIN VALID, IF THE SERVICING AND THE PERIODIC
INSPECTIONS ARE NOT PERFORMED.
Summary of Contents for 240RXT
Page 2: ...DINO 240RXT 2...
Page 3: ...DINO 240RXT 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 24040...
Page 7: ...DINO 240RXT 7 2 REACH DIAGRAM...
Page 8: ...DINO 240RXT 8 3 DIMENSION DRAWING...
Page 18: ...DINO 240RXT 18 S20 S18 S17 S19 S16 Q2 H6 H3 S30 S13 S1 OK2...
Page 36: ...DINO 240RXT 36 Notes...
Page 39: ...DINO 240RXT 39 17 3 LUBRICATION PLAN...
Page 41: ...DINO 240RXT 41 1...
Page 58: ...DINO 240RXT 58 Notes...
Page 60: ...DINO 240RXT 60 18 2 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Page 61: ...DINO 240RXT 61...
Page 83: ...DINO 240RXT 83 21 ELECTRIC DIAGRAM 24021...
Page 84: ...DINO 240RXT 84...
Page 85: ...DINO 240RXT 85...
Page 86: ...DINO 240RXT 86...
Page 87: ...DINO 240RXT 87...
Page 88: ...DINO 240RXT 88...
Page 89: ...DINO 240RXT 89...
Page 90: ...DINO 240RXT 90...
Page 91: ...DINO 240RXT 91...
Page 92: ...DINO 240RXT 92...
Page 93: ...DINO 240RXT 93...
Page 94: ...DINO 240RXT 94...
Page 95: ...DINO 240RXT 95...
Page 96: ...DINO 240RXT 96...
Page 97: ...DINO 240RXT 97...
Page 98: ...DINO 240RXT 98...
Page 99: ...DINO 240RXT 99...
Page 100: ...DINO 240RXT 100...
Page 101: ...DINO 240RXT 101...
Page 102: ...DINO 240RXT 102...
Page 103: ...DINO 240RXT 103...
Page 104: ...DINO 240RXT 104...
Page 105: ...DINO 240RXT 105...
Page 106: ...DINO 240RXT 106...
Page 107: ...DINO 240RXT 107 Notes...
Page 110: ...DINO 240RXT 110 24 HYDRAULIC DIAGRAM BOOM OPERATION No 24013...
Page 112: ...DINO 240RXT 112 26 HYDRAULIC DIAGRAM BOOM OPERATION WITH OPTIONAL EQUIPMENT No 24010...
Page 113: ...DINO 240RXT 113 Notes...