DINO 105T
21
OPERATING THE LIFT FROM THE CHASSIS PANEL
11.
Turn the operating switch (1) to
position 3
-
now you can operate the boom with
levers 5-7 on the chassis control
panel.
-
test the operation of the emergency
descent system as follows:
-
extend the telescope (switch 7)
-
lift the boom about 1 - 2 metres
(with switch 6) and at the same time
push down the emergency stop
button (3) - the movement should
stop.
-
Open the emergency descent valve 13 for the telescope and retract the telescope completely
using the hand pump 14 (the handle is inside the main centre cover)
-
Close the emergency descent valve
for the telescope
-
Push down the emergency descent
valve 12 until the boom starts lowering
BE CAREFUL OF THE BOOM!
-
pull up the emergency stop button.
Note!
The platform levelling does not operate while the emergency descent
system is in use.
Carefully push down the emergency descent valve 12 and observe the
platform during the lowering.
DO NOT DAMAGE THE HAND BRAKE AND THE TOWBAR JOCKEY WHEEL!
From the chassis control panel the boom can only be operated at the 1-speed.
Lock the selector switch (1) in position 1 (support outriggers) before working under the boom
Make sure that neither people nor load are on the platform.
13
5
6
7
1
3
14
12
Summary of Contents for DINO 105T
Page 2: ...DINO 105T 2...
Page 3: ...DINO 105T 3 OPERATING INSTRUCTIONS...
Page 4: ...DINO 105T 4 Valid from serial number 5336...
Page 8: ...DINO 105T 8 REACH DIAGRAM 120 kg...
Page 34: ...DINO 105T 34 LUBRICATION PLAN...
Page 37: ...DINO 105T 37...
Page 69: ...DINO 105T 69 ELECTRIC DIAGRAM 5336...
Page 70: ...DINO 105T 70...
Page 71: ...DINO 105T 71...
Page 72: ...DINO 105T 72...
Page 73: ...DINO 105T 73...
Page 74: ...DINO 105T 74...
Page 75: ...DINO 105T 75 Notes...
Page 77: ...DINO 105T 77 HYDRAULIC DIAGRAM 5336...
Page 78: ...DINO 105T 78 Notes...