DINO 105TL
21
S6
S5
S8
S9
S7
S4
S10
S12
9.3 OPERATING CONTROLS IN THE PLATFORM CONTROL CENTRE UCB
Take away the key from the selector switch Q1 before you start
operating the lift from the platform control centre UCB
S4. Emergency stop
S8. Lever for lifting the boom system
S5.Low speed selection/start
S9. Lever for telescope movement
S6. High speed selection/start
S10.Sound signal
S7. Lever for turning the boom system
S12. Lever for levelling the platform
Summary of Contents for DINO 105TL
Page 2: ...DINO 105TL 2 ...
Page 3: ...DINO 105TL 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 10196 ...
Page 6: ...DINO 105TL 6 HYDRAULIC DIAGRAM 10189 81 23 1 NOTES 82 ...
Page 8: ...DINO 105TL 8 2 REACH DIAGRAM ...
Page 9: ...DINO 105TL 9 3 DIMENSION DRAWING ...
Page 35: ...DINO 105TL 35 o that the driving device is disconnected from the wheel ...
Page 38: ...DINO 105TL 38 18 3 LUBRICATION PLAN 1 2 3 4 5 5 6 7 8 10 9 11 12 ...
Page 41: ...DINO 105TL 41 ...
Page 53: ...DINO 105TL 53 19 1 1 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM ...
Page 54: ...DINO 105TL 54 ...
Page 69: ...DINO 105TL 69 21 1 NOTES ...
Page 73: ...DINO 105TL 73 23 ELECTRIC DIAGRAM 105TL 10196 ...
Page 74: ...DINO 105TL 74 ...
Page 75: ...DINO 105TL 75 ...
Page 76: ...DINO 105TL 76 ...
Page 77: ...DINO 105TL 77 ...
Page 78: ...DINO 105TL 78 ...
Page 79: ...DINO 105TL 79 ...
Page 80: ...DINO 105TL 80 ...
Page 81: ...DINO 105TL 81 HYDRAULIC DIAGRAM 10189 ...
Page 82: ...DINO 105TL 82 23 1 NOTES ...