DINO 105TL
52
19 INSPECTION INSTRUCTIONS
All lifting equipment and lifting gear used at a construction site must always be inspected
before use. The lifts and related lifting gear used on a work site shall be subjected to a
regular maintenance inspection; if possible once a week. (VNA 205/2009, 14§ - 18§)
Keep a journal of any notable shortcomings and defects observed and advise the foreman
of them.
19.1 FIRST INSPECTION
The initial inspection and test loading of the Dino access platforms is performed by
the manufacturer. A protocol which accompanies the lift is drawn up of the
inspection.
Summary of Contents for DINO 105TL
Page 2: ...DINO 105TL 2 ...
Page 3: ...DINO 105TL 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 10196 ...
Page 6: ...DINO 105TL 6 HYDRAULIC DIAGRAM 10189 81 23 1 NOTES 82 ...
Page 8: ...DINO 105TL 8 2 REACH DIAGRAM ...
Page 9: ...DINO 105TL 9 3 DIMENSION DRAWING ...
Page 35: ...DINO 105TL 35 o that the driving device is disconnected from the wheel ...
Page 38: ...DINO 105TL 38 18 3 LUBRICATION PLAN 1 2 3 4 5 5 6 7 8 10 9 11 12 ...
Page 41: ...DINO 105TL 41 ...
Page 53: ...DINO 105TL 53 19 1 1 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM ...
Page 54: ...DINO 105TL 54 ...
Page 69: ...DINO 105TL 69 21 1 NOTES ...
Page 73: ...DINO 105TL 73 23 ELECTRIC DIAGRAM 105TL 10196 ...
Page 74: ...DINO 105TL 74 ...
Page 75: ...DINO 105TL 75 ...
Page 76: ...DINO 105TL 76 ...
Page 77: ...DINO 105TL 77 ...
Page 78: ...DINO 105TL 78 ...
Page 79: ...DINO 105TL 79 ...
Page 80: ...DINO 105TL 80 ...
Page 81: ...DINO 105TL 81 HYDRAULIC DIAGRAM 10189 ...
Page 82: ...DINO 105TL 82 23 1 NOTES ...