DINO 105TL
61
19.6 TEST LOADING INSTRUCTIONS FOR REGULAR INSPECTION
1. Place the lift on an even surface with good carrying capacity.
2. Drive the outriggers to their lowest position (the minimum support width).
3. Turn the boom to the side from the tow-bar and lower it on the ground.
4. Put a weighed load of 130 kg onto the platform.
5. Lift the boom to as high as it goes and extend the telescope to its full length
(maximum lifting height).
6. Lower the boom to a horizontal position (maximum outreach).
7. Turn the boom round over 360° and establish the standing stability.
8. Retract the telescope and lower the boom.
After the above mentioned test loadings and the subsequent inspection have been
completed without finding any defects in the structure or stability of the lift, the lift may be
used provided that the reach and platform load restrictions, presented in the reach/platform
load chart of this manual, are observed.
The max. allowed load on the platform is 130 kg
– In conjunction with the first, i.e. start-up, inspection, the lift shall be subjected to an
overload test with an excess load of 50 % and after that the supporting structures shall
be thoroughly inspected.
– In conjunction with the annual inspection the lift shall be subjected to a regular
inspection, a test-run and a test loading with maximum permissible load and a thorough
inspection of the supporting structures.
– The first inspection shall be recorded in the start-up inspection protocol - the test runs
shall be recorded in the protocols for the annual and regular inspection.
Summary of Contents for DINO 105TL
Page 2: ...DINO 105TL 2 ...
Page 3: ...DINO 105TL 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 10196 ...
Page 6: ...DINO 105TL 6 HYDRAULIC DIAGRAM 10189 81 23 1 NOTES 82 ...
Page 8: ...DINO 105TL 8 2 REACH DIAGRAM ...
Page 9: ...DINO 105TL 9 3 DIMENSION DRAWING ...
Page 35: ...DINO 105TL 35 o that the driving device is disconnected from the wheel ...
Page 38: ...DINO 105TL 38 18 3 LUBRICATION PLAN 1 2 3 4 5 5 6 7 8 10 9 11 12 ...
Page 41: ...DINO 105TL 41 ...
Page 53: ...DINO 105TL 53 19 1 1 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM ...
Page 54: ...DINO 105TL 54 ...
Page 69: ...DINO 105TL 69 21 1 NOTES ...
Page 73: ...DINO 105TL 73 23 ELECTRIC DIAGRAM 105TL 10196 ...
Page 74: ...DINO 105TL 74 ...
Page 75: ...DINO 105TL 75 ...
Page 76: ...DINO 105TL 76 ...
Page 77: ...DINO 105TL 77 ...
Page 78: ...DINO 105TL 78 ...
Page 79: ...DINO 105TL 79 ...
Page 80: ...DINO 105TL 80 ...
Page 81: ...DINO 105TL 81 HYDRAULIC DIAGRAM 10189 ...
Page 82: ...DINO 105TL 82 23 1 NOTES ...