DINO 95T
60
–
check the condition of the chassis
-
general condition
-
check the attachment of the tow-bar to the chassis
-
check the condition of the overrun and its attachment to the chassis.
-
check the axle and its attachment to the chassis
-
check the attachment and condition of the brake wires and rods
-
check the rims, the tightness of the wheel bolts, the tyres and the tyre pressure
-
check the condition of the driving device, attachment of the parts and condition
of the covers for electric components
-
check the condition of the transport support of the boom
–
perform a test run/ test of operating controls with a load of 120 kg on the platform
–
also check the operation of the limit switches during the test run (refer to the service
instructions)
-
the limit switches on the outriggers, which prevent the operation of the boom
movements
-
the limit switches on the tow-bar, which prevent the use of the outriggers
-
after the test-loading and test drive make sure that the steel structures or other loaded parts do
not show signs of structural defects, such as fractures or dangerous permanent deformations
-
draw up a protocol of the regular inspection with following articles:
1. inspection form
2. data of repair welds
1)
date of repair
2)
repaired by whom
3)
what was repaired
-
as the machine is ready for operation after the annual inspection, mark the inspection date on
the inspection plate affixed to the lift
19.5 EXTRAORDINARY INSPECTION
(INSPECTION AFTER AN EXCEPTIONAL SITUATION)
The inspection is required if the lift has been damaged in a manner which may affect its
load-bearing capacity or safe operation.
–
thus the lift shall be inspected according to the instructions for the start-up inspection
–
perform a test-loading with an overload of 25 % and a stability test of the lift
–
a protocol shall be drawn up for the inspection
Summary of Contents for Dino 95T
Page 2: ...DINO 95T 2...
Page 3: ...DINO 95T 3 ORIGINAL OPERATING INSTRUCTIONS Valid from serial number 95003...
Page 7: ...DINO 95T 7 2 REACH DIAGRAM...
Page 8: ...DINO 95T 8 3 DIMENSION DRAWING...
Page 39: ...DINO 95T 39 18 3 LUBRICATION PLAN...
Page 42: ...DINO 95T 42...
Page 53: ...DINO 95T 53 19 1 1 SAMPLE OF INSPECTION PROTOCOL FOR THE ACCESS PLATFORM...
Page 54: ...DINO 95T 54...
Page 69: ...DINO 95T 69 Notes...
Page 75: ...DINO 95T 75 24 ELECTRIC DIAGRAM 95T 95001...
Page 76: ...DINO 95T 76...
Page 77: ...DINO 95T 77...
Page 78: ...DINO 95T 78...
Page 79: ...DINO 95T 79...
Page 80: ...DINO 95T 80...
Page 81: ...DINO 95T 81...
Page 82: ...DINO 95T 82...
Page 83: ...DINO 95T 83...
Page 84: ...DINO 95T 84...
Page 85: ...DINO 95T 85 Notes...
Page 87: ...DINO 95T 87 26 HYDRAULIC DIAGRAM 95001...
Page 88: ...DINO 95T 88 Notes...