47
5.2.3.
Special instructions for winter use
The lowest allowed operating temperature of the lift is -20 °C
In cold conditions, carry out the following special actions in addition to the normal start-up
procedure
1. Let the power pack run for a few minutes before starting the movements.
2. To ensure the proper operation of the valves, do a few warm-up movements to change
warm oil in the cylinders.
3. Check that the limit switches and the emergency descent devices are operational and
clean (from dirt, snow, ice, etc.).
4. Protect the control centre and the platform from snow and ice whenever they are not in
use.
5. Ensure that the batteries are charged. Flat batteries freeze easily.
Always keep the lift free from dirt, snow etc.
5.2.4.
Ending the work
At the end of the workday:
1. Retract the telescopic boom fully.
2. Check that the platform is perpendicular to the boom.
3. Lower the boom/platform onto the support on the tow-bar. The limit switch on the
transport support prevents the operation of the support outriggers if the platform is not
down.
4. Close the control centre cover on the work platform.
5.
Turn the selector switch to position OFF, and turn off the main switch.
6. If you want to recharge the battery, leave the mains cable connected; otherwise
disconnect the lift from the mains supply.
7. Make sure that the covers are locked.
DANGER
WARNING
CAUTION
NOTICE
To ensure proper operation and long service life of the batteries, it is recommended to
always recharge them at the end of each workday, even though there was still plenty of
charge left. Storing the batteries flat shortens their service life, and flat batteries also freeze
easily.
Summary of Contents for DINO XT II 160
Page 2: ......
Page 6: ...6 Ekspluat cijas instrukcijas DINO 160XT II 180XT II 210XT II BLANK...
Page 11: ...11 2 1 2 180 XTB II...
Page 12: ...12 Operating instructions DINO 160XTB II 180XTB II 210XTB II 2 1 3 210 XTB II...
Page 29: ...29 BLANK...
Page 37: ...37 NOTES...
Page 58: ...58 Operating instructions DINO 160XTB II 180XTB II 210XTB II NOTES...
Page 59: ...59 NOTES...
Page 63: ...63 7 2 LUBRICATION PLAN 6 9 7 11 7 8 1 5 5 3 2 12 3 4 10 13 14...
Page 69: ...69 BLANK...
Page 70: ...70 Operating instructions DINO 130T II BLANK...
Page 72: ...72 Operating instructions DINO 130T II NOTES...
Page 73: ...73 NOTES...