Operating instructions • DINO 130T II
5.
USING THE LIFT
5.1. STARTING UP
The operator must inspect the worksite and carry out the daily start-up routines always:
• at the beginning of each workday
• before operating the lift at a new worksite
• when the operator changes in the middle of a workday
5.1.1.
Worksite inspection
1. General information
• Is the lift suited for the intended job?
•
Is the performance of the lift sufficient for the job? (reach, loadability etc.)
• Is the position of the lift safe?
•
Is the lighting on the worksite sufficient?
2. Documents
• Are the Operation and Service Instructions for this lift present?
• Are inspections and servicing carried out in accordance with the instructions and
have the defects affecting the safety been checked as repaired?
(Inspection protocols)
3. Operator
• Is the operator of the lift old enough?
• Has the operator received the required training?
• Is the operator in suitable condition for operating the machine? The machine must
not be operated under the influence of alcohol or any other intoxicant, or if the
operator's physical or mental capacity in some other respect has been impaired from
normal.
4. Special issues on the worksite
• Are there any additional regulations relevant to the worksite or the work?
• Are there any other potential hazards (gantry cranes, shafts, ATEX areas, closed
spaces) present at the work site, which should be observed during the operation?
•
Does the work area have to be marked or fenced off to prevent outsiders from
moving inside the danger zone under the boom or the work platform?
5. Condition of the lift
• Carry out all the daily service measures in accordance with the instructions
• Never operate the machine, if it is out of order.
Summary of Contents for DINO XT II 160
Page 2: ......
Page 6: ...6 Ekspluat cijas instrukcijas DINO 160XT II 180XT II 210XT II BLANK...
Page 11: ...11 2 1 2 180 XTB II...
Page 12: ...12 Operating instructions DINO 160XTB II 180XTB II 210XTB II 2 1 3 210 XTB II...
Page 29: ...29 BLANK...
Page 37: ...37 NOTES...
Page 58: ...58 Operating instructions DINO 160XTB II 180XTB II 210XTB II NOTES...
Page 59: ...59 NOTES...
Page 63: ...63 7 2 LUBRICATION PLAN 6 9 7 11 7 8 1 5 5 3 2 12 3 4 10 13 14...
Page 69: ...69 BLANK...
Page 70: ...70 Operating instructions DINO 130T II BLANK...
Page 72: ...72 Operating instructions DINO 130T II NOTES...
Page 73: ...73 NOTES...