need to operate at higher pressures (up to 28 MPa, or
4000 psi), first torque the bolts to 128 in-oz. If the valve is to
be unused for more than two days, reduce the torque on the
bolts to 90 in-oz while installing or removing the fittings.
Use a wrench on the valve pressure bolt to prevent it from
turning while loosening the fitting. Refer to Installation and
Maintenance of the Dionex High-Pressure Valve (Document
No. 032678) for additional information.
2.3.8 Detector Cells
Detector cells for the CD20 Conductivity Detector or the
ED40 Electrochemical Detector are mounted on the
component panel. Their cables exit through one of the service
chases on the rear panel.
2.3.9 DS3 Detection Stabilizer (Optional)
The DS3 improves baseline stability by damping fluctuations
in temperature, thus improving detection at trace levels. Refer
to the DS3 Detection Stabilizer Installation Instructions
(Document No. 034850).
2
•
Description
Doc. 034859-02 9/93
2-11
Summary of Contents for LC20
Page 6: ...Contents iv Doc 034859 02 9 93 ...
Page 8: ...LC20 Chromatography Enclosure 1 2 Doc 034859 02 9 93 ...
Page 12: ...LC20 Chromatography Enclosure 2 2 Doc 034859 02 9 93 ...
Page 24: ...LC20 Chromatography Enclosure 2 14 Doc 034859 02 9 93 ...
Page 26: ...LC20 Chromatography Enclosure 3 2 Doc 034859 02 9 93 ...
Page 29: ...Figure 3 7 Drawing Sample 3 Operation and Maintenance Doc 034859 02 9 93 3 5 ...
Page 32: ...LC20 Chromatography Enclosure 3 8 Doc 034859 02 9 93 ...
Page 34: ...LC20 Chromatography Enclosure 4 2 Doc 034859 02 9 93 ...
Page 40: ...LC20 Chromatography Enclosure 4 8 Doc 034859 02 9 93 ...
Page 42: ...LC20 Chromatography Enclosure 5 2 Doc 034859 02 9 93 ...
Page 50: ...LC20 Chromatography Enclosure 5 10 Doc 034859 02 9 93 ...
Page 52: ...LC20 Chromatography Enclosure A 2 Doc 034859 02 9 93 ...
Page 56: ...LC20 Chromatography Enclosure B 2 Doc 034859 02 9 93 ...
Page 65: ...Figure B 6 Electrochemical Cell Plumbing Schematic B Installation Doc 034859 02 9 93 B 11 ...