B.2.3 Leak Control
If a leak occurs, waste liquid will accumulate in the bottom
of the enclosure. The bottom is slanted to collect the liquid in
the trough on the left side. A line at the rear of the trough
drains the liquid from the enclosure and into a waste
container. A leak detector cell is located on the sidewall of
the trough to detect and report any leaks. The output of the
sensor should be connected to any module that can process
the signal and report it as a fault.
A leak is generally not a serious event. However, all leaks
should be stopped and the floor should be dried and rinsed
with deionized water to prevent formation of salt crystals.
B.2.4 Liquid Line Connections
The LC20 Ship Kit contains PEEK tubing in three different
IDs. After selecting the appropriate tubing size (see below),
you will need to cut the tubing to the lengths required to
plumb the system. However, before cutting any tubing, be
sure that it is long enough to allow servicing the system (e.g.,
you should be able to open the front door of the LC20 and
slide the component panel out of the enclosure to its detent
without putting stress on the tubing).
•
For 4-mm column systems: Use 0.25-mm (0.010-in) ID
PEEK tubing (P/N 042690) for connections between
system components.
•
For 2-mm column systems: Use 0.125-mm (0.005-in)
ID PEEK tubing (P/N 044221) for connections between
system components.
•
For both systems: Use 0.5-mm (0.020-in) ID PEEK
tubing (P/N 042885) for valve waste lines and 0.25-mm
(0.010-in) ID PEEK tubing (P/N 042690) for detector cell
waste lines.
If preferred, ThermoFlare
tubing can be installed where
pressures are below 7 MPa (1000 psi). This may include
LC20 Chromatography Enclosure
B-6
Doc. 034859-02 9/93
Summary of Contents for LC20
Page 6: ...Contents iv Doc 034859 02 9 93 ...
Page 8: ...LC20 Chromatography Enclosure 1 2 Doc 034859 02 9 93 ...
Page 12: ...LC20 Chromatography Enclosure 2 2 Doc 034859 02 9 93 ...
Page 24: ...LC20 Chromatography Enclosure 2 14 Doc 034859 02 9 93 ...
Page 26: ...LC20 Chromatography Enclosure 3 2 Doc 034859 02 9 93 ...
Page 29: ...Figure 3 7 Drawing Sample 3 Operation and Maintenance Doc 034859 02 9 93 3 5 ...
Page 32: ...LC20 Chromatography Enclosure 3 8 Doc 034859 02 9 93 ...
Page 34: ...LC20 Chromatography Enclosure 4 2 Doc 034859 02 9 93 ...
Page 40: ...LC20 Chromatography Enclosure 4 8 Doc 034859 02 9 93 ...
Page 42: ...LC20 Chromatography Enclosure 5 2 Doc 034859 02 9 93 ...
Page 50: ...LC20 Chromatography Enclosure 5 10 Doc 034859 02 9 93 ...
Page 52: ...LC20 Chromatography Enclosure A 2 Doc 034859 02 9 93 ...
Page 56: ...LC20 Chromatography Enclosure B 2 Doc 034859 02 9 93 ...
Page 65: ...Figure B 6 Electrochemical Cell Plumbing Schematic B Installation Doc 034859 02 9 93 B 11 ...