B.2.2 Waste Lines
Install the piece of 12.5-mm (0.5-in) OD tubing (P/N 035759)
over the waste nipple in the lower left corner of the LC20
rear panel (see Figure 2-5). Make sure the opposite end of the
line is inserted into a waste container below the level of the
enclosure and that it is not bent, pinched, or elevated at any
point (see Figure B-2).
Minor leaks do not generally present a serious situation, but
they should be thoroughly rinsed with deionized water and
dried to prevent salt solutions from crystallizing on the
enclosure surfaces.
Neutralize acidic and caustic waste before disposal.
Dispose of wastes containing organic solvents in
accordance with local regulations.
Figure B-2. Waste Lines Installation
B
•
Installation
Doc. 034859-02 9/93
B-5
Summary of Contents for LC20
Page 6: ...Contents iv Doc 034859 02 9 93 ...
Page 8: ...LC20 Chromatography Enclosure 1 2 Doc 034859 02 9 93 ...
Page 12: ...LC20 Chromatography Enclosure 2 2 Doc 034859 02 9 93 ...
Page 24: ...LC20 Chromatography Enclosure 2 14 Doc 034859 02 9 93 ...
Page 26: ...LC20 Chromatography Enclosure 3 2 Doc 034859 02 9 93 ...
Page 29: ...Figure 3 7 Drawing Sample 3 Operation and Maintenance Doc 034859 02 9 93 3 5 ...
Page 32: ...LC20 Chromatography Enclosure 3 8 Doc 034859 02 9 93 ...
Page 34: ...LC20 Chromatography Enclosure 4 2 Doc 034859 02 9 93 ...
Page 40: ...LC20 Chromatography Enclosure 4 8 Doc 034859 02 9 93 ...
Page 42: ...LC20 Chromatography Enclosure 5 2 Doc 034859 02 9 93 ...
Page 50: ...LC20 Chromatography Enclosure 5 10 Doc 034859 02 9 93 ...
Page 52: ...LC20 Chromatography Enclosure A 2 Doc 034859 02 9 93 ...
Page 56: ...LC20 Chromatography Enclosure B 2 Doc 034859 02 9 93 ...
Page 65: ...Figure B 6 Electrochemical Cell Plumbing Schematic B Installation Doc 034859 02 9 93 B 11 ...