Grounding and Bonding
Follows current DIRECTV approved installation methods
Refer to the
Standard Professional Installation Guidelines (SPIG)
for more information
Available on the DWS
Visit
http://satinstallinstalltraining.com
for additional information
Must adhere to all NEC, state and local codes
Whichever more stringent
Use building “house” ground whenever possible
Use a ground block to bond the ODU and D2 Lite enclosure to the
building ground
Ground block must be installed after the ODU and before the D2 Lite
enclosure
Should be located where the best access to a suitable ground location is
Do NOT use an ODU attachment, adjustment screw or bolt as the ground
and/or bond point
Maintain proper bend radius at all times
Follows RG6 bend radius rules
2.75” radius (5.5” diameter)
Summary of Contents for D2 Advantage Lite
Page 1: ...Installation and Troubleshooting Guidelines ...
Page 5: ...D2 Lite Components Continued SWiM16 Module Band Stop Filter MDU version PI 29z Power Inserter ...
Page 33: ...D2 Lite Installation Diagrams V1 1 Receiver ...
Page 34: ...D2 Lite Installation Diagrams V1 2 Receivers ...
Page 35: ...D2 Lite Installation Diagrams V2 1 Receiver ...
Page 36: ...D2 Lite Installation Diagrams V2 2 Receivers ...
Page 37: ...D2 Lite Electrical Interconnect Diagram V1 ...
Page 38: ...D2 Lite Electrical Interconnect Diagram V2 ...
Page 40: ...Q A ...
Page 41: ......