D2 Lite Enclosure Testing
SWiM #1
In the unit
Run EIV+ at the
SIGNAL TO IRD
port on the power inserter
If EIV+ fails troubleshoot issue to resolution
At the D2 Lite enclosure
Run EIV+ at
APMT FEED
s
2
,
3
,
4
(assumes APMT FEED 1 is connected to the homerun
and power inserter)
If EIV+ fails at any port, replace D2 Lite enclosure
DO NOT ATTEMPT TO REPLACE ANY COMPONENTS IN THE D2 Lite enclosure
SWiM #2 (if installed)
Same as SWiM #1 using
APMT FEED
s
5
,
6
,
7
,
8
The D2 Lite enclosure needs be tested after it is installed and prior to
activating the first customer on each SWiM module. Testing should
take place after the homerun wiring is completed and the power
inserter is installed and powered on. These steps can also be used to
troubleshoot the D2 Lite system.
Summary of Contents for D2 Advantage Lite
Page 1: ...Installation and Troubleshooting Guidelines ...
Page 5: ...D2 Lite Components Continued SWiM16 Module Band Stop Filter MDU version PI 29z Power Inserter ...
Page 33: ...D2 Lite Installation Diagrams V1 1 Receiver ...
Page 34: ...D2 Lite Installation Diagrams V1 2 Receivers ...
Page 35: ...D2 Lite Installation Diagrams V2 1 Receiver ...
Page 36: ...D2 Lite Installation Diagrams V2 2 Receivers ...
Page 37: ...D2 Lite Electrical Interconnect Diagram V1 ...
Page 38: ...D2 Lite Electrical Interconnect Diagram V2 ...
Page 40: ...Q A ...
Page 41: ......