19
Central Vacuum Systems
CHECK LIST FOR THE INSTALLER
YEARLY MAINTENANCE CONTRACT
Check of inlet socket’s tightness
Check of the starting of the system at the
inlet sockets
Check of the wear of vacuum cleaning
accessories
Check of the suction value
Filter check and cleaning
Check of the functioning of the automatic
filter-shaking device*
Check of the turbine’s operation
Check of the functioning of the starting
device system*
Check of the correct adjusting of the by-
pass valves
Inversion of sequence of the starting of the
turbines.
We suggest entrusting your installer with the yearly maintenance
of the modular systems in order to always keep the system at its maximum efficiency
* if available