background image

DISPLAYS2GO

 

Interactive Whiteboard

 

 

 

2.

 

Set up the Whiteboard 

2.1

 

Wall Mounting 

The wall mounting installation is quick and easy using the included hardware kit.  

Minimum 2 people. Tools required: power drill, bubble level, adjustable wrench.

Hardware 

a.  Mounting Bracket 

– Top 

b.  Metal Bracket 

– Bottom 

c.  M8 Expansion Wall Anchor 

d.  M4 Screw 

QTY. 

2 pcs 

1 pc 

5 pcs 

2 pcs 

 
 
 
 
 

Step 1: Assemble the Metal Bracket (b) to the bottom back-side of the white board with (2) M4 
screws (d), as shown below. Do not tighten the screws. 

 

Step 2: Drill holes on the wall where the whiteboard will be. Drill 5 holes that are 

3

8

 inch in 

diameter and 2 inches deep at the locations marked as “A” below. 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

Metal Bracket (b) 

Summary of Contents for INTWHITWRD

Page 1: ...ode to visit the product page Operating Instructions for Whiteboard Note Before using the product please read the instructions thoroughly If you have any questions regarding our products please visit us at www displays2go com or contact D2G customer service at 844 221 3393 ...

Page 2: ...08 ii Table of Contents 1 Introduction 3 2 Set up the Whiteboard 4 2 1 Wall Mounting 4 2 2 Floor Standing 6 3 Connection 7 4 Calibration 8 4 1 Install the Calibration Software 8 4 2 16 or 9 point calibration 8 5 Technical Specifications 11 ...

Page 3: ...ore information Other opaque objects or your fingers can also work like a computer mouse Features Writing users can write and draw on the whiteboard with included eMark Pen or a stylus during a lecture or a presentation Annotation users can easily operate and annotate on the screen during presentation and lecture The eMark Pen can fully function with all the supported file types and applications i...

Page 4: ...ch Hardware a Mounting Bracket Top b Metal Bracket Bottom c M8 Expansion Wall Anchor d M4 Screw QTY 2 pcs 1 pc 5 pcs 2 pcs Step 1 Assemble the Metal Bracket b to the bottom back side of the white board with 2 M4 screws d as shown below Do not tighten the screws Step 2 Drill holes on the wall where the whiteboard will be Drill 5 holes that are 3 8 inch in diameter and 2 inches deep at the locations...

Page 5: ... against the wall See below Step 4 Insert a screwdriver or other metal rod into the anchor sleeve Hit the other end of the tool with a hammer to fix the anchors in the wall Step 5 Align 2 mounting brackets a to the upper wall anchors Secure them to the wall by tightening the hex screws back to wall anchors through the slots on the brackets Step 6 Carefully lift the whiteboard and hang it on the wa...

Page 6: ...he whiteboard Step 8 Use the removed M8 hex screw to secure the bracket at bottom to the wall The installation is completed CAUTION For your safety the whiteboard has to be mounted to solid wall ONLY Please use the included wall anchor and follow the installation instructions 2 2 Floor Standing The whiteboard can also be used with a mobile stationary stand Please find the floor stand that is compa...

Page 7: ...use Connect the whiteboard with your PC and projector 1 Insert the USB end of the provided serial cable into one USB port on your PC and insert the other end of the cable into the whiteboard 2 Connect the PC with the projector with HDMI or VGA cable not included 3 Power on the PC and projector Adjust the position and focus for projected image as needed The connection is finished ...

Page 8: ...rojector 4 1 Install the Calibration Software Install the calibration software from the supplied USB flash drive onto your PC Then Find and open the Optical Touch Device Control Panel on your Windows desktop 4 2 16 or 9 point calibration Click Setting at bottom of the calibration software ...

Page 9: ...DISPLAYS2GO Interactive Whiteboard 9 Choose 16 points in calibration section then click Apply and OK to confirm the selection Next click Calibrate to enter the calibration window ...

Page 10: ...ISPLAYS2GO Interactive Whiteboard 10 Follow the instructions on the screen press and hold the blue dot It will turn green after long press After 16 dots all turn to green the calibration is done Press OK ...

Page 11: ...h Area 72 91x45 59 in 1852x1158 mm Dimension 75 94x48 62x1 34 in 1929x1235x34 mm Interface USB2 0 Full Speed Power Requirements DC5V 5 500mA Power Consumption Average power consumption 2 5W 5V Software Firmware Upgrade Supported Device Type Touch with gesture support per OS or Mouse click drag double click right click Calibration 4 point 16 point 25 point Operating Systems Windows 10 Environment O...

Page 12: ...DISPLAYS2GO Interactive Whiteboard 12 ESD Per EN 61000 4 2 Level 4 contact discharge 6KV air discharge 8KV ...

Reviews: