1592006230 XB590L GB r1.0 29.02.2016
XB590L
27/32
17. SERIAL LINE
The instruments of the XB line are endowed with a serial output, which can be TTL or RS485 (optional).
The serial line TTL, by means of an external module TTL/RS485, enables the interfacing with a compatible
ModBUS-RTU monitoring system such as XWEB3000, or XWEB500 (Dixell).
By using the same serial output, it is possible to load and download the whole parameter list with the “
HOT
KEY
” programming key.
Upon request, the instruments can also be supplied with the RS485 direct serial connection (optional).
It is possible, through the WIZMATE (Dixell) software, to manage the device parameters via a computer.
18.
USE OF THE PROGRAMMING “HOT KEY “
18.1
DOWNLOAD (FROM THE “HOT KEY” TO THE INSTRUMENT)
1.
Turn OFF the instrument by means of the ON/OFF key, remove the TTL serial cable if present, insert the
“Hot Key”
and then turn the Wing ON.
2.
Automatically the parameter list of the
“Hot Key”
is downloaded into the Wing memory, the
“DoL”
message is blinking. After 10 seconds the instrument will restart working with the new parameters.
3.
Turn OFF the instrument, remove the
“Hot Key”,
plug in the TTL serial cable and then turn it ON again.
At the end of the data transfer phase the instrument displays the following messages:
-
End
for right programming. The instrument starts regularly with the new programming.
-
Err
for failed programming. In this case turn the unit off and then on if you want to restart the
download again or remove the
“Hot key”
to abort the operation.
18.2 DOWNLOAD PROCEDURE OF PARAMETERS FROM THE INSTRUMENT TO THE USB KEY
1.
Turn OFF the instrument by means of the ON/OFF key and remove the TTL serial cable if present; then
turn it ON again.
2.
When the unit is ON, insert the
“Hot Key”
and push the
UP
key; the
“UPL”
message will appear.
3.
Push
SET
key to start the UPLOAD; the
“UPL”
message will start blinking.
4.
Turn OFF the instrument, remove the
“Hot Key”
,
plug in the TTL serial cable and then turn it ON again.
At the end of the data transfer phase the instrument displays the following messages:
-
End
for right programming. The instrument starts regularly with the new programming.
-
Err
for failed programming. In this case turn the unit off and then on if you want to restart the
download again or remove the
“Hot key”
to abort the operation.