35
CARE AND MAINTENANCE
HYDROSTAT DRIVE BELT
REPLACEMENT PROCEDURE:
To install hydrostat pump drive belt:
1.
Rotate the spring loaded take-up idler towards
the left hand hydro pump.
2.
Install belt per diagram.
3.
Install double u-joint and tighten flange bolts
(tighten to 14 ft. lbs.).
4.
Install radiator and mounting hardware.
5.
Attach radiator hoses and refill cooling system.
All manuals and user guides at all-guides.com