background image

THE   FOLLOWING   INSTRUCTION REFER TO 1989 PTOFUVYION 42” MOERT FRVKD    

Installation:

 

1.        Position  mower   deck   assembly   under   frame,  raise   front   of  mower   deck  assembly 

enough   to  allow  cross   shaft  (P/N  1332)   to   slide   through   frame   guides  and mower  
deck  guides.     Install (1)   washer   (P/N   3094)    and (1) hair pin cotter (P/N   3072)   on each   
end   of   the   cross   shaft.

 

 

2.        Attach   short   L - r o d    (P/ N 1355)   to   l i f t    arms as   shown   in   drawing.

 

 

3.        Attach long   L- r o d    ( P / N 1409)    to   r e a r    l i f t   arms   as   s h o w n   in drawing.

 

 

 

 

 

Reviews: