CARE AND MAINTENANCE
DECK LEVELING AND HEIGHT ADJUSTING PROCEDURE
1.
On the right side of the machine,
the tie bar between the lift arms should be adjusted so
there is 20-1/2" between clevis eyes. If adjustment is necessary, loosen jam nuts on
both ends of the bar, and turn bar by hand until 20 -1/2" dimension is achieved. Tighten
jam nuts securely back against both ends of the bar.
On the left side of the machine,
the tie bar should be adjusted so the angle of the rear lift
arm matches the angle of the right rear lift arm. If adjustment is necessary, loosen jam
nuts on both ends of the bar, and turn bar by hand until angle of the two rear lift arms
match. Tighten jam nuts securely back against both ends of bar. See Figure 1.
2. Move lift handle to mid-range and use blade height gage (8241) to check side-
to-side and front-to-rear blade heights.
3. Adjust side-to-side blade heights to within 1/8", and adjust front-to-rear blade heights so
rear of blade is 0 to 1/4" higher than front of blade.
4. If any of the deck hanger bolts hang loose, thread it further into clevis until it is snug.
Take special care not to have an effect on the deck height.
5. Tighten jam nuts up against clevis.
Page 26
Summary of Contents for ZTR 6601
Page 1: ......
Page 3: ......
Page 13: ...CONTROLS Page 10...
Page 27: ...Page 23...
Page 42: ...6601 T Box Hydro Gearbox...
Page 43: ...6601 Gearbox...
Page 44: ...6601 Mower Deck...
Page 45: ...6601 Chassis...
Page 46: ...6601 Fuel Hydro Tanks Fittings...
Page 47: ...6601 Body...
Page 48: ...Page 44 6601Wiring...
Page 49: ...NOTES...