12 | AC10G(H) man.
LOCATION
It is extremely important to install the compressor in a clean, well-ventilated area where the
surrounding air temperature will not be more than 100˚F.
A minimum clearance of 18 inches between the compressor and a wall is required because objects
could obstruct airflow.
CAUTION! Do not locate the compressor air inlet near steam, paint spray, sandblast areas
or any other source of contamination. This debris will damage the motor.
ELECTRICAL INSTALLATION
WARNING! All wiring and electrical connections should be performed by a qualified
electrician. Installation must be in accordance with local codes and national electric codes.
CAUTION! Never use an extension cord with this product. Use additional air hose instead of
an extension cord to avoid power loss and permanent motor damage; use of an extension
cord voids the warranty.
GROUNDING INSTRUCTIONS
1.
This product is for use on a nominal 120 volt
circuit and has a grounding plug that looks
like the plug shown (Fig.1). Make sure the
product is connected to an outlet having
the same configuration as the plug. This
product must be grounded. In the event
of an electrical short circuit, grounding
reduces risk of electrical shock by providing
an escape wire for electric current. This
product is equipped with a cord having a grounding wire with an appropriate grounding
wire with an appropriate grounding plug. Plug must be plugged into an outlet that is
properly installed and grounded in accordance with all local codes and ordinances.
DANGER! Improper use of grounding plug can result in a possible risk of
electrical shock.
DANGER! Do not use a grounding adapter with this product.
2.
If repair or replacement of cord or plug is necessary, do not connect grounding wire
to either flat blade terminal. The wire with insulation having an external surface that is
green (with or without yellow stripes) is the grounding wire.
FIGURE 1
ENGLISH
Summary of Contents for AC10G
Page 5: ...SECTION I SAFETY ...
Page 11: ...SECTION II INSTALLATION ...
Page 14: ...SECTION III OPERATION ...
Page 18: ...SECTION IV MAINTENANCE ...
Page 22: ...SECTION V PARTS SCHEMATICS ...
Page 25: ...v 220629 25 SCHEMATICS ENGLISH ...
Page 30: ...SECTION I SÉCURITÉ ...
Page 37: ...SECTION II INSTALLATION ...
Page 40: ...SECTION III FONCTIONNEMENT ...
Page 44: ...SECTION IV ENTRETIEN ...
Page 48: ...SECTION V PIÈCES ET SCHÉMAS ...
Page 51: ...v 220629 51 SCHÉMAS FRANÇAIS ...
Page 52: ......