83
EPO setting
LCD display
Settings
EP setting ON required.
EPO(Emergency Power Off) setting only can
be set in Stdby mode or Bypass mode. You
may choose the following two options:
ON:
EPO enable
OFF
(default)
:
EPO disable
6. Maintenance
6.1 Verifying UPS operation
It’s
necessary to provide the following operations during the maintenance:
1. Check the operation of the UPS.
If the mains voltage is in allowable range, the UPS is working in utility
mode. If the mains voltage is out of the allowable range, the UPS operates
in battery mode. In both cases, this is not a fault.
2. Check the transition from one mode to another.
Disconnect power to simulate network failure. The UPS transfers into the
battery mode, then try to reconnect the power cable and make sure that the
system returns to the utility mode.
3. Check for errors
During the tests, described above, make sure that the operating mode on
the display is the same as the actual operating mode of the UPS.
6.2 UPS maintenance
Preventive maintenance of The UPS can ensure its reliability and long life time.
The following tests must be carried out every month:
Shutdown the UPS (see User’s manual);
Check the vent to make sure it is not blocked;
Summary of Contents for SMALLT1
Page 1: ...User s Manual Small Tower 1000 3000 Uninterruptible Power Supply Small Tower 1000 3000 VA...
Page 2: ......
Page 7: ...5...
Page 8: ...6...
Page 9: ...7 1 SMALLT1 SMALLT2 SMALLT3 2 125167 4 8 6 9 7 800 250 52 63 service dkc ru...
Page 10: ...8 3 3 1 Small Tower 3 2 1...
Page 11: ...9 3 3 1 2 3 1 3 4 3 4 1 2 15 3 4 3 5...
Page 12: ...10...
Page 15: ...13 4 3 Small Tower IGBT VFI IEC EN62040 1 2...
Page 16: ...14 2 4 4 4 4 1 4 4 2...
Page 17: ...15 4 4 3 4 4 4 4 5 3 4 5 1...
Page 18: ...16 4 5 2 4 5 3 4 6 4 6 1...
Page 20: ...18 1 4 1 2 3 4 4 7 4 7 1 RS232 USB RS232 port 1 2 3 4 5 6 7 8 9...
Page 24: ...22 AS400 7 DB 9 5 24 DB9 AS400 11 D8 D6 D2 D8 D9 D2 D7 D8 D9 D1 D2 D8 K1 K1 7 DB 9...
Page 25: ...23 5 5 1 8 0 5 0 5 1 1 15 2 2...
Page 26: ...24 0 5 2 0 5 2 2 2 0 5 2 0 5 2 2 0 5 2 8...
Page 27: ...25 5 2 9 0 25 26 50 51 75 76 100 0 25 26 50 51 75 and 76 100...
Page 28: ...26 ECO CUCF 20 20 STDBY BYPASS LINE BAT BATT ECO SHUTDN CUCF 9 5 3 5 3 1 OFF ON...
Page 29: ...27 ON 0 5 ON 0 5 5 3 2 OFF 0 5 BPS ON OFF 7 5 4 2...
Page 30: ...28 3 8 5 4 ON ON Line...
Page 31: ...29 bat 4 ECO ECO ECO ECO ECO...
Page 32: ...30 CUCF CUCF CUCF 50 CUCF 80 60 CUCF 70 OFF 10 5 5 0 5 2...
Page 33: ...31 220 50 800 1 0 v1 7 40 220 50 24 100 11...
Page 34: ...32 5 6 2 0 5 2 0 5 2 0 5 2 1 2 0 5 2 208 220 230 240...
Page 35: ...33 9 8 9 9 10 10 2 10 5 dEF dEF 21 5 CF ON OFF 50 60 ON OFF...
Page 37: ...35 EPO EP EPO ON EPO OFF EPO 6 6 1 1 2 3...
Page 38: ...36 6 2 6 3 1 15 25 C 2 6 3...
Page 39: ...37 4 2 5 6 8 8 2 30 1 2 3 4 5...
Page 43: ...41 10 0 1 2 3 4 5 6 7 8 9 A B...
Page 44: ...42 C D E F 0 1 2 3 4 5 6 7 8 9 A B C D E F EEPROM Median 0 1 2 3 4 5 6 7 8 9 A B...
Page 45: ...43 C D E F 4 0 1 2 3 4 5 6 7 14 2000 7 2 11 00 14...
Page 46: ...44 15 24 25 39 40 44 10 45 49 50 54 55 59 NTC 60 64...
Page 47: ...45 65 69 On 2 3 15...
Page 50: ...48 13 SMALLT1A10 14 SMALLT2A5...
Page 51: ...49 15 SMALLT2A10 16 SMALLT3A5...
Page 52: ...50 17 SMALLT3A10...
Page 54: ...52 8 5 004 2011 020 2011 9 2 batt dkc ru service_center...
Page 55: ...53 8 800 250 52 63 service dkc ru www dkc ru...
Page 56: ...54...
Page 57: ...55 English language...
Page 58: ...56...
Page 99: ...97 Figure 15 Runtime graph of SMALLT2A5 Figure 16 Runtime graph of SMALLT2A10...
Page 100: ...98 Figure 17 Runtime graph of SMALLT3A5 Figure 18 Runtime graph of SMALLT3A10...
Page 103: ......
Page 104: ......