Spa
Location
1
2
3
4
5
6
CLEARANCES
CHECK THE FOLLOWING AREAS PRIOR TO SPA DELIVERY
1. STEPS - We suggest no more than six without a landing.
2. TREE BRANCHES - Clearance for spa passage.
3. TIGHT CORNERS - Make sure there is space to maneuver.
4. STORAGE SHEDS, DOG HOUSES, WOOD PILES - Remove out of the way.
5.GATES:CLEARANCE FOR PASSAGE OF SPA - Does gate need to be removed
from hinges?
6. OVERHANGS AND GUTTERS - Anything overhead, as well as drain pipe
locations, must allow for spa passage.
— 6 —