background image

 

                                                                           

www.dmegcsolar.com                                                                                                                                                                                        10 

 

figure4                                                                                                              figure 5 

 

6.3 Test Loads and Design Loads 

 

The  Standard/lower  loading  capacity  applies  to  normal 
environment: the modules are tested under a maximum 
positive pressure of 2400 Pa, and negative pressure of 
1600 Pa, the modules are designed to meet a maximum 
positive  pressure  of  1600Pa,  and  negative  pressure  of 
1067 Pa, this design load was then tested with a safety 
factor of 1.5 times. 

 

The high loading capacity applies to severe environment, 

like storm, big snow, etc. The modules are tested under a 
maximum  positive  pressure  of  5400  Pa,  and  negative 
pressure of 2400 Pa, the modules are designed to meet a 
maximum  positive  pressure  of  3600  Pa,  and  negative 
pressure of 1600 Pa, this design load was then tested with 
a safety factor of 1.5 times. 

 

For  bifacial  double-glass  modules,  it  is  recommended 
that  the  beam  is  installed parallel  to the long frame to 
reduce backside shielding. 

M10-60H / 66H / 72H / 78H & M10-B/G-60H / 66H / 72H / 78H 

Installation method 

4 bolts at the long frame (60H inner holes) 

4 bolts at the long frame (66H/72H/78H outer holes) 

Bolt installation 

 

 

Loading capacity 

Test load: positive 3600Pa, negative 2400Pa 

Design load: positive 2400Pa, negative 1600Pa 

Test load: positive 3600Pa, negative 2400Pa 

Design load: positive 2400Pa, negative 1600Pa 

Installation method 

4 clamps at the long frame 

6 clamps at the long frame 

Clamp installation 

 

 
 

Summary of Contents for M10-54H

Page 1: ...an Group DMEGC Magnetics Co Ltd Hengdian Industrial Area Dongyang City Zhejiang Province China Tel 86 579 86310330 E mail solar dmegc com cn Ver 202206 Installation Manual of Standard Solar Modules Ph...

Page 2: ...fety Precautions 3 3 Mechanical Electrical Specifications 3 4 Unpacking and Storage 4 5 Module Installation 5 5 1 Module Wiring 6 5 2 Grounding 8 6 Mounting Instructions 8 6 1 Mounting Method Bolting...

Page 3: ...e module such as terminals can result in injury or death irrespective of whether or not the module and the other electrical equipment have been connected General Safety All modules must be installed b...

Page 4: ...onths and extra precautions should be taken to prevent connectors from being exposed to moisture or sunlight like using connector endcaps In any circumstance for pallets of modules packaged in landsca...

Page 5: ...open air climates as defined in IEC 60721 2 1 Classification of environmental conditions Part 2 1 Environmental conditions appearing in nature Temperature and humidity It is recommended that PV module...

Page 6: ...same cell cell row or module portion for extended and repeated periods of time e g more than 200 daylight hours over the warrantied service lifetime Power dissipated in fully or partially shaded cell...

Page 7: ...ctor should be connected to each other as soon as possible or appropriate measures like using connector endcaps should be taken to avoid moisture and dust penetrating into the connector Do not connect...

Page 8: ...es DMEGC Solar s Modules can be grounded using third party grounding devices so long as they are certified for grounding modules and the devices are installed according to the manufacturer s specified...

Page 9: ...figure 3 below figure 3 6 2 Mounting Method Clamping The mechanical load test with these mounting methods were performed according to IEC 61215 Top or bottom clamping methods will vary and are depende...

Page 10: ...re of 2400 Pa the modules are designed to meet a maximum positive pressure of 3600 Pa and negative pressure of 1600 Pa this design load was then tested with a safety factor of 1 5 times For bifacial d...

Page 11: ...ort frame Bolt installation Clamp installation Clamp position 0 H 1 4W Loading capacity Test load positive 5400Pa negative 2400Pa Design load positive 3600Pa negative 1600Pa Loading capacity Test load...

Page 12: ...ps at the long frame Clamp installation Clamp position 1 4L 50 S 1 4L 50 1 2L 80 S 1 2L 30 1 6L 50 H 1 6L 50 Loading capacity Test load positive 5400Pa negative 2400Pa Design load positive 3600Pa nega...

Page 13: ...bolts at the long frame inner holes 8 bolts at the long frame Bolt installation Loading capacity Test load positive 5400Pa negative 2400Pa Design load positive 3600Pa negative 1600Pa Test load positi...

Page 14: ...oved using a soft brush Periodically inspect the system to check the integrity of all wiring and supports To protect against electric shock or injury electrical or mechanical inspections and maintenan...

Page 15: ...asive to glass EPDM silicone aluminum or steel Conduct the cleaning activities avoiding the hottest hours of the day in order to avoid thermal stress on the module CLEANING METHODS Method A Compressed...

Page 16: ...DMEGC Solar PV Modules Installation Manual www dmegcsolar com 16 DMXXXM2 60SW BW BB DMXXXM2 G B72SW BW BB BT DMXXXM2 72SW BW BB DMXXXP1 60HSW BW DMXXXP1 72HSW BW DMXXXP1 60SW BW DMXXXP1 72SW BW...

Reviews: