background image

Instructions for installation, setup and operation - FP9000

 

 

Page 

2

 of 

2

 

 

− Back up battery - 2х12V / 5 Ah  
− Degree of protection - IP 40  
− Operational temperature range - minus 5ºС - plus 40ºС  
− Relative humidity resistance - (92±3)% at 40ºС  
− Dimensions - 305х250х100 mm  
− Weight of the feeder - 1.0 kg  
 

CONTENT OF DELIVERY 

 

− Power supply FP9000 Р  

 

 

- 1 pc.  

− Instruction Manual    

 

 

- 1 pc.  

− Fuse 4A  

 

 

 

 

- 3 pcs.  

− Connecting bridge for the back up batteries   - 1 pc.  
− Package 

 

 

 

 

 - 1 pc.  

 

 

 

 

INSTALLATION  

To install the power supply please follow the sequence:  
1. Dismantle the cover by unscrewing the fixings on the front panel.  
2. Drill the holes for the connecting wires. Observe the marked places.  
3. Install the required connecting wires to the module.  
4. It is recommended to install the multi-core connecting wires with cable shoes.  
5. Put the indicating PC board cable wires in the respective terminals . Then install the cover by means of the 
fixings. 
  

SERVICE SCHEDULE 

 

1. Inspection for visible physical damages - monthly  

   2. Satisfactory operation test 

– monthly 

 

WARRANTY 

 

The warrant period is 24 months from the date of purchase. The manufacturer guarantees the normal operation 
of  the  unit  providing  that  the  requirements  set  herein  have  been  observed.  The  manufacturer  does  not  bear 
warranty  liabilities  for  damages  caused  through  accidental  mechanical  damage,  misuse,  adaptation  or 
modification after production.  

Reviews: