Instructions for installation, setup and operation - FP9000
Page
2
of
2
− Back up battery - 2х12V / 5 Ah
− Degree of protection - IP 40
− Operational temperature range - minus 5ºС - plus 40ºС
− Relative humidity resistance - (92±3)% at 40ºС
− Dimensions - 305х250х100 mm
− Weight of the feeder - 1.0 kg
CONTENT OF DELIVERY
− Power supply FP9000 Р
- 1 pc.
− Instruction Manual
- 1 pc.
− Fuse 4A
- 3 pcs.
− Connecting bridge for the back up batteries - 1 pc.
− Package
- 1 pc.
INSTALLATION
To install the power supply please follow the sequence:
1. Dismantle the cover by unscrewing the fixings on the front panel.
2. Drill the holes for the connecting wires. Observe the marked places.
3. Install the required connecting wires to the module.
4. It is recommended to install the multi-core connecting wires with cable shoes.
5. Put the indicating PC board cable wires in the respective terminals . Then install the cover by means of the
fixings.
SERVICE SCHEDULE
1. Inspection for visible physical damages - monthly
2. Satisfactory operation test
– monthly
WARRANTY
The warrant period is 24 months from the date of purchase. The manufacturer guarantees the normal operation
of the unit providing that the requirements set herein have been observed. The manufacturer does not bear
warranty liabilities for damages caused through accidental mechanical damage, misuse, adaptation or
modification after production.