7 |
P a g e
Operating the SGP
™
:
A.
Lift the fully adjusted and secured SGP
™
tool to the ceiling.
B.
Make sure your screw gun is perpendicular to the substrate you are fastening into.
C.
Always keep your back straight and keep the pole tool close to your body.
D.
Apply lifting force to the pole to engage the screw gun tool
’
s magazine / driver. Start the screw
gun by pressing against the substrate.
E.
Do not force the fasteners. Periodically check to make sure the screws are being properly driven
to the desired depth.
F.
When the fastener is fully installed, carefully lower the tool and adjust for your next installation.
G.
If electrical power to the screw gun is interrupted during use and the tool becomes jammed in
the ceiling, disconnect the electric power to the screw gun and clear the jam in a safe manner
before restoring electric power.