20
999775002 - 02/2020
Anchoring on the structure
User Information
Climbing formwork 150F
Positioning point with Positioning cone 15.0
5cm (with hole drilled through form-ply)
Installation:
➤
Drill a diam. 18
mm hole in the form-ply (position as
shown in shop drawing / assembly plan).
➤
Insert a Tie rod 15.0 (length approx. 20
cm)
through
the hole drilled in the form-ply, screw it into the posi-
tioning cone and tighten it with a Super plate 15.0.
Positioning point with Cantilever positioning
cone 15.0
5cm (with no hole drilled through
form-ply)
For special applications only, when it is not possible to
drill through the form-ply (e.g. where there are Doka
beams or formwork panel frame profiles directly behind
the positioning point).
Installation:
➤
Nail a cantilever positioning cone to the form-ply
using a Fixing plate 15.0 (position as shown in pro-
ject plan).
A
Stop anchor 15.0
B
Positioning cone 15.0 5cm + Sealing sleeve 15.0 5cm
C
Super plate 15.0
D
Tie rod 15.0mm
If the positioning point is located too close to a
Doka beam, a board can be nailed to this and
the adjoining beam to provide a support sur-
face for the super plate.
9775-226-01
C
B
A
D
9775-227-01
A
Stop anchor 15.0
E
Cantilever positioning cone 15.0 5cm + Sealing sleeve S 15.0
5cm
F
Fixing plate 15.0
NOTICE
It is not permitted to use the Fixing plate 15.0
more than once in the same position, as it can-
not be fixed firmly and securely in the old nail-
holes.
9775-231-01
E
A
F
Summary of Contents for 150F
Page 2: ...2 999775002 02 2020 User Information Climbing formwork 150F ...
Page 26: ...26 999775002 02 2020 Anchoring on the structure User Information Climbing formwork 150F ...
Page 34: ...34 999775002 02 2020 Repositioning User Information Climbing formwork 150F ...
Page 52: ...52 999775002 02 2020 Assembly User Information Climbing formwork 150F ...